40-assessment.md — the verdict in one paragraph (skeleton real, discipline
exceptional, the two deepest commitments unproven in opposite directions);
the cognitive cycle stage-by-stage with the honest sentence for each; what
is excellent, stated as findings; the macro picture (built-and-dark,
capability outruns proof, the record decays faster than the code); THE
FIVE FRONTIERS (the reading, the verdict, the chooser, the proof of life,
the throughput — everything else on the registers is hygiene, enforcement,
or ceremony); the recommended attack order in five waves sequenced by the
mastery algorithm (scrub/rule -> delete -> simplify/enforce -> accelerate
evidence loops -> automate last, with the warning that an always-on
process consolidating an empty set is "garbage at high speed" and CORE
came within one flag of it); the charter's four questions answered
directly; and the maintenance contract that keeps this directory from
becoming the next dead instrument.
README.md — the directory index and reading order.
The assessment is complete: 21 documents, four phases, three
self-corrections, every claim SHA-stamped at 8927c563.
2.6 KiB
docs/assessment/ — The Holistic Macro→Micro Assessment (2026-07-27)
A read-only, evidence-bearing assessment of CORE's cognitive-cycle design versus implementation fulfillment, conducted under docs/conceptualizing_engineering_mastery.md at forgejo/main @ 8927c563. It changes no runtime behavior, fixes no defect, and decides nothing — it produces evidence and judgments for ruling.
Start here: 40-assessment.md — the synthesis (the verdict, the five frontiers, the recommended attack order). Then the registers. The cards are the evidence base.
| File / dir | Phase | What it is |
|---|---|---|
00-scope-and-method.md |
— | Charter, method, rules of engagement, phase/executor table |
01-phase0-ground-truth.md |
0 | Corpus triage, the five unreconciled articulations, system-map recovery |
02-layer-taxonomy.md |
1 | The two-axis taxonomy: 7 macro layers + 2 cross-cuts over 33 zones; the Candidate Register (CR-1…4); completeness criteria |
03-card-schema.md |
1 | The card metadata schema: liveness ⊥ fitness, design ⊥ build, sabotage-tested evidence, verified_at stamps |
10-layer-cards/ |
2 | Nine layer cards (M0–M6, MG, MV), every liveness label re-verified against code |
04-phase2-findings.md |
2 | Stage-coverage audit; corrections to Phase 0; findings F-1…F-5 |
20-component-cards/ |
3 | Eight component cards: the four zero-subsystem zones + always-on, derivation organs, surface selection, attention |
05-phase3-findings.md |
3 | Corrections C-1…C-5; findings F-6…F-10; the consolidated Phase-4 seed list |
30-gap-register.md |
4 | The live gap register — 20 entries, 4 tiers, each with evidence + deciding authority (proposes superseding docs/gaps.md) |
31-hindrance-audit.md |
4 | Eleven hindrances with fitness verdicts and better homes; five candidates examined and cleared |
40-assessment.md |
5 | The synthesis |
Maintenance contract (from §8 of the synthesis): a card whose verified_at falls behind a load-bearing arc is testimony, not evidence. Update cards when their subsystems move, or this directory becomes the next dead instrument it was built to replace.
Standing note: the PR #138 fabrication findings appear throughout as measured & pinned, fix held for ADR + ratification — recorded, never re-discovered, never fixed here, per explicit instruction.