core/docs/handoff
Shay ebfdc8b461 docs(adr-0249): ratify ADR-0249 ACCEPTED (Shay, commit 220039f7)
Stamp the §10 ruling record: Status Proposed→Accepted; four design rulings
affirmed; honest-by-construction measurement (0 wrong / 26 correct / 24 refused
on real GSM8K, PARITY vs symbolic fold) affirmed as the definitive outcome.
Next arc selected: Tier-2 arithmetic (multi-entity/transfer/rate/comparison/
fraction). Acceptance-evidence status updated to RATIFIED. Doc-only.
2026-07-18 13:25:39 -07:00
..
ADR-0243-PHASE3-BRIEF-PACK.md docs(adr-0243): fix Phase 3 brief pack references to the deleted Phase 2 branch 2026-07-17 06:57:23 -07:00
ADR-0244-D4-IMPLEMENTATION-PLAN.md docs(adr-0244-d4): RATIFIED — ADR-0244 + ADR-0245 Proposed→Accepted (Joshua Shay) 2026-07-17 20:28:18 -07:00
ADR-0246-Acceptance-Evidence.md feat(evals): seams S4+S5 — generalized-lift instrument + ports/handoff evidence 2026-07-18 10:34:26 -07:00
adr-0246-slice1-scaffold-notes.md draft(adr-0246): slice-1 scaffold — §6.1/§6.2 eval suite + malformed-F guard 2026-07-17 22:09:32 -07:00
ADR-0249-Acceptance-Evidence.md docs(adr-0249): ratify ADR-0249 ACCEPTED (Shay, commit 220039f7) 2026-07-18 13:25:39 -07:00