The operational W0-W5 plan that drove the arc was never committed — it lived only as a gitignored .claude/plan/ artifact in an orphaned worktree. This commits the durable plan-to-outcome record: phase-by-phase status against the original plan, the unplanned CI-collapse/local-first pivot that consumed the post-ratification session, and the remaining backlog. |
||
|---|---|---|
| .. | ||
| adr-0241-0242-mastery-close-status.md | ||
| adr-0241-0242-session-completion-summary-2026-07-15.md | ||
| adr-0241-cohesion-mastery-plan-p0-p12.md | ||
| adr-0242-drive-complete-plan-d0-d10.md | ||
| audio-compiler-eval-plan.md | ||
| audio-compiler-spec.md | ||
| capability_roadmap.md | ||
| core-general-advancement-plan.md | ||
| DEMO-PACKAGING-CHECKLIST.md | ||
| formation_pipeline_plan.md | ||
| PUBLIC-DEMO-ROADMAP.md | ||
| vision-compiler-eval-plan.md | ||
| vision-compiler-spec.md | ||