core/docs/analysis
Shay 5ae377065e docs: composition-wall execution scope (ADR-0207 §5 step 2)
Three reviewed, non-serving analysis/handoff docs for the COMPOSITION lever.
Read-only; no serving code; train_sample 6/44/0 untouched.

- analysis/wiring-promotion-gate-brief: product_bridge is the only serving
  derivation tendril (two-token target whitelist); resolve_pooled refuses all
  ten R1/R4/R5/R6 positives and wrong-commits 0016 -> 510. Wiring is trivial;
  the gate is the work.
- analysis/composition-wall-execution-plan: per-case stage taxonomy (A/B/C/D)
  for all 15 corpus positives, reproduced live; R4-first scope (new
  goal-residual production, verified by code-read of accumulate.py, NOT a
  target tweak); promotion gate generalizes product_bridge, never disagreement
  alone; gates inherit ADR-0207 §6 (corpus + sealed 1,319).
- handoff/stage-c-composition-investigation: dispatch task for the execution
  lane to pin the per-case bail for the production-wrong shapes (the real
  grouping/op-order wall), read-only, in-tree.
2026-06-03 21:14:02 -07:00
..
composition-capability-scope.md docs: mark ADR-0174 Phase 5a shipped in composition-capability-scope 2026-06-03 16:23:53 -07:00
composition-wall-execution-plan-2026-06-03.md docs: composition-wall execution scope (ADR-0207 §5 step 2) 2026-06-03 21:14:02 -07:00
comprehension-primitive-inventory.md Add canonical composition analysis docs 2026-06-03 15:35:58 -07:00
extraction-richness-audit-2026-06-03.md docs: ratify ADR-0207 — GSM8K comprehension/composition substrate 2026-06-03 19:42:47 -07:00
question-layer-gap-survey.md
solver-operation-coverage.md
wiring-promotion-gate-brief-2026-06-03.md docs: composition-wall execution scope (ADR-0207 §5 step 2) 2026-06-03 21:14:02 -07:00