Three reviewed, non-serving analysis/handoff docs for the COMPOSITION lever.
Read-only; no serving code; train_sample 6/44/0 untouched.
- analysis/wiring-promotion-gate-brief: product_bridge is the only serving
derivation tendril (two-token target whitelist); resolve_pooled refuses all
ten R1/R4/R5/R6 positives and wrong-commits 0016 -> 510. Wiring is trivial;
the gate is the work.
- analysis/composition-wall-execution-plan: per-case stage taxonomy (A/B/C/D)
for all 15 corpus positives, reproduced live; R4-first scope (new
goal-residual production, verified by code-read of accumulate.py, NOT a
target tweak); promotion gate generalizes product_bridge, never disagreement
alone; gates inherit ADR-0207 §6 (corpus + sealed 1,319).
- handoff/stage-c-composition-investigation: dispatch task for the execution
lane to pin the per-case bail for the production-wrong shapes (the real
grouping/op-order wall), read-only, in-tree.
Phase 5a (retire the inert GSM8K scoring-path comprehension-reader
dispatch, -1,038 LOC) landed in 3fd3172, an ancestor of HEAD 8327c6b,
but composition-capability-scope.md still listed it as remaining work --
drift that mis-scoped a downstream brief. Re-anchor the canonical doc to
the tree:
- §1: the lifecycle.py GSM8K-scoring dispatch row now reads "retired in
Phase 5a (3fd3172)" instead of "inert ... retirable in 5a".
- §2: Phase 5a marked SHIPPED with a runway-status banner; the §9
completeness-gate precondition marked LANDED (PR #534, e1bcdf6).
- §4: sequencing restructured -- items 0 (§9 precondition), 1 (gating
analysis), 3 (5a) are DONE; the live runway starts at item 2 (the
<=20-case validation sub-corpus), then Phase 5b.
- §9: status banner noting the recommended guard landed (#534); the
"RED on main" statements are the pre-landing measurement, kept for
provenance.
Docs-only. No code/eval/serving change. Baseline re-verified at HEAD:
train_sample 6/44/0 (all 44 refusals at branches_enumerated=0),
completeness-guard suite 21 passed.