core/docs/handoff
Shay 8ef80daa04 docs(adr-0244-d4): Phase 5 COMPLETE — §2.7/§2.9/§2.10 + ADR-0245 §3 gate
Plan doc (scope tables + Phase 5 status/resume + progress log + dashboard) and
ADR-0245 status map updated: §2.3 residual done (5a), §2.9 proven (5b), §2.10
audited (5c), §3 acceptance gate all four legs green (5d). Also corrected the
Phase-4 SHA reference (17ec6eee → 918aa843, amend lag). Next: Phase 6 close-out;
all build phases (0-5) complete.
2026-07-17 20:03:02 -07:00
..
ADR-0243-PHASE3-BRIEF-PACK.md docs(adr-0243): fix Phase 3 brief pack references to the deleted Phase 2 branch 2026-07-17 06:57:23 -07:00
ADR-0244-D4-IMPLEMENTATION-PLAN.md docs(adr-0244-d4): Phase 5 COMPLETE — §2.7/§2.9/§2.10 + ADR-0245 §3 gate 2026-07-17 20:03:02 -07:00