2.5 KiB
Brief: ADR-0241 Non-Vacuous Chiral Spinor Charge (P8)
For: Antigravity / Gemini design + TDD
Status: STOP POINT after P7 demotion
Branch: feat/adr-0241-0242-implementation (PR #37)
Takeoff
git fetch forgejo
git checkout feat/adr-0241-0242-implementation
git pull forgejo feat/adr-0241-0242-implementation
Read:
AGENTS.mddocs/adr/ADR-0241-...md(chiral charge row; #19 retirement)docs/research/third-door-blueprint-fidelity.mdW4 / #19 sectioncore/physics/wave_manifold.py—chiral_charge,left_spinor_stepdocs/briefs/P7_design_note.md(honesty doctrine — do not invent theater)
Problem
ADR claims non-vacuous \mathcal{Q}=\langle\psi I_5\widetilde{\psi}\rangle_0.
Today chiral_charge is honest structural ~0 on real Cl(4,1) (even product × central I_5 has no grade-0 for the #19 family). Tests lock conservation of ~0 and even-versor honesty.
P8 goal: either (A) a non-vacuous spinor path with informative conserved Q, without reviving vacuous #19 gate on even unit versors; or (B) permanent demotion of non-vacuous claim with ADR language + fidelity ⚪ RETIRED, if design proves impossible under real Cl(4,1) without complex/pair structure.
Hard constraints
- Must not revive grade-5 gate on even unit versors (#19)
- Even field-state path stays honest (~0 or N/A)
- Spinor / odd-capable path: if non-vacuous, Q informative + conserved under left unitary
R - Algebra-native; no hot-path unitize; off-serve
- Prefer fail-closed / honest demotion over fake non-zero Q
Design options to evaluate (pick one with proof sketch)
- Pair-spinor / complex structure via central
I_5as algebraici - Even/odd split with grade-sensitive charge
- Two-component left ideals in Cl(4,1)
- Permanent demotion (document why real Cl(4,1) cannot host non-vacuous Q)
RED tests (if implementing non-vacuous)
test_chiral_charge_nonzero_on_designed_spinor_packet
test_chiral_charge_conserved_under_left_unitary_R
test_chiral_charge_still_honest_zero_on_even_unit_versor
test_goldtether_chiral_term_only_when_informative
If demoting: one behavioral pin that documents structural vacuity remains and ADR/fidelity language is honest.
Out of scope
P9 contemplation seam, Rust, serve wiring, re-opening retired multi-grade analytic polar (P7).
Success
Non-vacuous spinor Q or honest permanent demotion; W4 fidelity flipped under honest criterion; PR #37 updated on Forgejo.