docs: weekly audit 2026-07-22 — straggler fixes + TODO ledger #98

Merged
core-labs merged 1 commit from chore/audit-2026-07-22-stragglers into main 2026-07-23 01:40:29 +00:00
Owner

Audit pass over the cleanup week (PR #76#97), per Shay's directive: verify the old-ADR catch-up work, fix small stragglers, ledger the bigger items.

Fixes in this PR (docs-only)

  1. ADR-0132 — parent-proposal pointer updated to docs/paradigm-archive/ (old docs/implementation/ path was left dangling by the ADR-0252 §9 archive move).
  2. docs/research/ADR-0243-…md — replaced with a tombstone. It was a pre-ratification near-duplicate still claiming Status: Proposed while the canonical docs/adr/ copy is Accepted (ratified 2026-07-17), and the two bodies had drifted. The one annotation unique to the copy (modality_transition_sandwich ingress note) is preserved in the tombstone; file kept so historical links resolve.
  3. docs/adr/README.md — indexed the binding non-ADR ownership note epistemic-taxonomy-ownership-stage3.md, which was referenced nowhere.
  4. New: docs/analysis/weekly-audit-2026-07-22-stragglers-todo.md — full audit record: what was verified sound, the session hygiene performed (4 merged worktrees + 3 merged remote branches removed per merge-then-cleanup doctrine), and a 9-item TODO (T1–T9) for items needing a ruling — headline items: T1 convergence-era invariants unregistered in runtime_contracts.md/AGENTS.md, T2 stale engine_state/ checkpoint warning, T8 folding #97's declared residuals into next-arc planning.

Audit verdicts (no change needed)

  • ADR status registry matches MASTER-BLUEPRINT-2026-07-20-ADR-MAPPING.md exactly; superseded-in-place annotations (0164/0174/0243/0244) accurate against code; excised dual-mode/L2 symbols absent from core/ and pinned absent by tests/test_stage2_physics_hardening.py; identity_wave_gate still default-off; uv lock --check clean; no new TODO/FIXME markers in the week's diff.

[Verification]: uv run core test --suite smoke -q in worktree core-wt-audit @ 91650874180 passed in 134.78s, exit 0. Baseline main @ f94dbd40 also green (180 passed).

Merge is left to explicit authorization per doctrine.

Audit pass over the cleanup week (PR #76 → #97), per Shay's directive: verify the old-ADR catch-up work, fix small stragglers, ledger the bigger items. ## Fixes in this PR (docs-only) 1. **ADR-0132** — parent-proposal pointer updated to `docs/paradigm-archive/` (old `docs/implementation/` path was left dangling by the ADR-0252 §9 archive move). 2. **`docs/research/ADR-0243-…md`** — replaced with a tombstone. It was a pre-ratification near-duplicate still claiming `Status: Proposed` while the canonical `docs/adr/` copy is Accepted (ratified 2026-07-17), and the two bodies had drifted. The one annotation unique to the copy (`modality_transition_sandwich` ingress note) is preserved in the tombstone; file kept so historical links resolve. 3. **`docs/adr/README.md`** — indexed the binding non-ADR ownership note `epistemic-taxonomy-ownership-stage3.md`, which was referenced nowhere. 4. **New: `docs/analysis/weekly-audit-2026-07-22-stragglers-todo.md`** — full audit record: what was verified sound, the session hygiene performed (4 merged worktrees + 3 merged remote branches removed per merge-then-cleanup doctrine), and a 9-item TODO (T1–T9) for items needing a ruling — headline items: T1 convergence-era invariants unregistered in `runtime_contracts.md`/`AGENTS.md`, T2 stale `engine_state/` checkpoint warning, T8 folding #97's declared residuals into next-arc planning. ## Audit verdicts (no change needed) - ADR status registry matches `MASTER-BLUEPRINT-2026-07-20-ADR-MAPPING.md` exactly; superseded-in-place annotations (0164/0174/0243/0244) accurate against code; excised dual-mode/L2 symbols absent from `core/` and pinned absent by `tests/test_stage2_physics_hardening.py`; `identity_wave_gate` still default-off; `uv lock --check` clean; no new TODO/FIXME markers in the week's diff. [Verification]: `uv run core test --suite smoke -q` in worktree `core-wt-audit` @ `91650874` — **180 passed in 134.78s**, exit 0. Baseline main @ `f94dbd40` also green (180 passed). Merge is left to explicit authorization per doctrine.
core-labs added 1 commit 2026-07-23 01:37:23 +00:00
core-labs merged commit e7140bf230 into main 2026-07-23 01:40:29 +00:00
core-labs deleted branch chore/audit-2026-07-22-stragglers 2026-07-23 01:40:30 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: core-labs/core#98
No description provided.