Closes the asymmetry between the `expert-demo` ledger status (audit
artifact only) and the actual `core demo` surface (runnable
walkthroughs producing HTML + JSON). Until this commit the word
"demo" in `expert-demo` was aspirational; now it corresponds to
something a reader can open.
What it does
- Reads the signed expert_demo_claims entry from docs/reviewers.yaml
- Loads latest on-disk result files for each attached lane × split
- Re-derives the evidence-bundle digest and asserts byte-for-byte
match against the signed claim_digest — this is the load-bearing
audit step, now exercised at two independent enforcement points
(ledger gate + showcase)
- Runs each lane's metrics through the ADR-0109 lane-shape registry
and surfaces the verdict
- Picks the first three cases from each split verbatim (deterministic
by file order) and renders them as HTML for inspection
- Emits expert_demo.json (canonical bytes, deterministic) + expert_demo.html
Surface
core demo expert --domain mathematics_logic
core demo expert --domain physics
# → evals/expert_demos/<domain>/latest/expert_demo.{json,html}
Read-only by construction: cannot mutate docs/reviewers.yaml or any
lane result file. Tested. Unpromoted domains raise ValueError —
no silent fallback, no "preview" mode that fakes a showcase.
Generated artifacts are gitignored — the inputs they derive from are
already committed, so duplicating the renders would just churn the
tree.
Tests: 16 new cases pinning all five ADR-0112 invariants. Smoke suite
still 67/67 green.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
ADR-0111 landed via PR #123 (merge commit 4b5e6b7). The structural docs
(README, ADR index, reviewers.yaml, CLAIMS.md) were updated in that PR.
The narrative docs that reference the worked-promotion arc by ordinal
("first promotion / one demonstrated domain") needed a follow-up sweep:
- docs/PROGRESS.md — ADR-0100 footnote, ADR-0111 row, ledger table,
Open-within-Phase-6 changed from "second" to "third" promotion
- docs/runtime_contracts.md — narrative line on contract demonstration
- docs/Whitepaper.md §XIII — chain range, demonstration paragraph,
"two domains demonstrated" line, full-chain pointer
- docs/capability_roadmap.md — Phase 6 worked-promotion narrative step 5
and exit-criteria checklist (5th item now ☑, 6th open as "third")
docs/Yellowpaper.md is unchanged: its expert-demo section is the formal
contract spec, domain-agnostic. docs/eval_methodology.md unchanged for
the same reason. docs/sessions/SESSION-2026-05-22-contract-layer-arc.md
is left as the historical snapshot of the original session.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Second worked promotion exercising the ADR-0106 + ADR-0109 contract
on a domain distinct from mathematics_logic. No contract change.
Evidence:
- foundational_physics_ood: accuracy=1.0 (117/117 public, 39/39 holdout)
- inference_closure: all_pass_rate=1.0 (shared with math, distinct digest via domain_id)
- fabrication_control: refused=n, fabricated=0 across all classes (shared)
Signed claim digest: a104cad136f3219df05dc7ce6a78437c02f7b5827cd3cdce568db3acda6a43ed
Bridge landed: cases_plaintext.jsonl dev-mode fallback for
foundational_physics_ood (matches ADR-0105 convention; analogous to the
math/inference bridges in ADR-0110). One small file, not a contract change.
Tests:
- tests/test_adr_0111_physics_expert_demo.py — 4 invariants, 6 cases
- tests/test_adr_0110_math_expert_demo.py — relaxed "only math promoted"
to "math stays promoted" (load-bearing for ADR-0110 is persistence)
- tests/test_capability_reports.py — physics row now expert-demo
Retires the "first promotion was math-specific" objection: the bridges
ADR-0110 landed were correctly scoped, and the contract holds across
two distinct domains using shared lane infrastructure with distinct
digests.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Closes the documentation audit. All four lower-priority surfaces from
the earlier scan now reflect the post-ADR-0110 reality.
New:
- docs/sessions/SESSION-2026-05-22-contract-layer-arc.md: full
narrative of the ADR-0103 -> ADR-0110 arc, including the
refused/amended/succeeded narrative, infrastructure bridges, and
ledger state at session close. Pairs with the 2026-05-21
articulation-arc session log.
Extended (additive, no rewrites):
- docs/runtime_contracts.md: new 'Expert-Demo Promotion Contract
(ADR-0106 + ADR-0109)' section. Surfaces ledger_report() shape,
reviewer-yaml schema, lane-shape registry, replay invariant,
fail-closed registry behavior, and trust boundary.
- docs/eval_methodology.md: new 'Lane-shape registry (ADR-0109)'
section. Documents what to do when adding a new eval lane:
pick a shape or amend ADR-0109. Notes the holdout-runner gating
(cases_plaintext.jsonl vs sealed). Header bumped to 2026-05-22.
- docs/Whitepaper.md: new section XIII 'Evidence-Governed Domain
Layer' between XII (Forward Semantic Control) and the
Extensions/closing. Narrates the contract chain at the
philosophical / external-reader level. The original §XIII
becomes §XIV.
- docs/Yellowpaper.md: new section XII 'Ratification Contract
(ADR-0091 + ADR-0106 + ADR-0109)'. Formal specification of the
nine predicates, the promotion predicate (with explicit logical
form), the digest function, and the lane-shape registry table.
The original §XII becomes §XIII.
No code, no tests, no contract changes.
PROGRESS.md was last updated mid-Phase-5 (~ADR-0021). The pack-layer
chain (ADR-0027..0045), forward-graph+surface composer chain
(ADR-0046..0089), and evidence-governed domain layer (ADR-0091..0110)
were all absent.
capability_roadmap.md was last updated 2026-05-17 and predated the
expert-demo promotion contract entirely.
Added to both:
- Phase 6 — Evidence-Governed Domain Layer section covering ADR-0091
contract chain through ADR-0110 expert-demo arc, including the
refused-amended-succeeded narrative and the current ledger state
(math at expert-demo, four others at reasoning-capable).
- Backfill subsections for ADR-0027..0045 (pack-layer chain) and
ADR-0046..0089 (forward-graph + surface-composer + register +
anchor-lens + contemplation-loop work) marked retrospective.
capability_roadmap.md also gains a '2026-05-22' status update at the
top alongside the existing 2026-05-17 entry. The full Phase 0-5
exit-criteria rewrite remains queued separately.
No code, no tests, no claims changes.
- README.md: fix broken evals/CLAIMS.md link to root CLAIMS.md;
add 'Evidence-Governed Domain Layer' section pointing to the
ADR-0091/0096/0106/0109 contract chain and current ledger state
(math at expert-demo, four other domains at reasoning-capable).
- docs/decisions/README.md: extend the 'fully accepted' slate from
0091..0105 to 0091..0110 with ADR-0106 through 0110 entries; extend
the 'Evidence-governed domain chain' chain-notes section to reflect
the expert-demo arc (refused-amended-succeeded narrative).
Between 2026-05-17 and 2026-05-22 the inference_closure lane regressed
from all_pass_rate=1.0 to 0.4 on public. Root cause: the
_DECLARATIVE_RELATION_RE branch in generate/intent.py runs ahead of the
_RULES loop and swallowed sentences beginning with 'Actually' into the
subject phrase, routing them to VERIFICATION. The lane's premise emit
path is gated on CORRECTION intent, so PackMutationProposal records
stopped being emitted for any non-'is' relation (precedes / grounds /
causes / reveals). Only the four transitive_is cases passed because
'is' is not in the declarative-relation verb list.
Fix: _CORRECTION_CUE_PREFIX_RE guard. When the text begins with a
correction cue ('Actually', 'Incorrect, ', 'No, ', 'Correction'), the
declarative-match branch is skipped and the sentence falls through to
the _RULES CORRECTION rule. Plain declarative-relation assertions still
route to VERIFICATION unchanged.
Lane on 2026-05-22 post-fix:
dev/v1: all_pass_rate=1.0, overall_pass=True (5 cases)
public/v1: all_pass_rate=1.0, overall_pass=True (20 cases)
- tests/test_correction_cue_prefix_routing.py pins both halves of the
guard (10 new tests).
- evals/inference_closure/gaps.md documents the regression + fix in a
new section, preserving the 2026-05-17 resolution narrative.
- evals/inference_closure/results/ now carries canonical v1_dev and
v1_public reports (the lane had no checked-in results before; ADR-0110
will reference these).
This unblocks the second of ADR-0107's two named blockers. ADR-0110
(math expert-demo re-attempt) now becomes feasible once the math
domain's three lanes have signed-and-digested evidence.
Replaces the cognition-shape-uniform threshold dispatch in
core/capability/expert_demo.py with an explicit LANE_SHAPE_REGISTRY
mapping 8 ratified lane ids to 5 shapes:
cognition -> cognition_shape
elementary_math_ood -> accuracy_shape
foundational_physics_ood -> accuracy_shape
symbolic_logic -> symbolic_logic_shape
hebrew_fluency -> accuracy_shape
koine_greek_fluency -> accuracy_shape
inference_closure -> inference_shape
fabrication_control -> refusal_shape
Each shape has a documented threshold checker. Unknown lane ids
fail-closed with a named reason. ADR-0106 \xc2\xa71.1/\xc2\xa71.3/\xc2\xa71.4/\xc2\xa71.5
unchanged; only \xc2\xa71.2 (threshold rules) dispatches by shape.
tests/test_lane_shape_thresholds.py pins all four ADR-0109 invariants
plus dead-shape and threshold-value gates (13 new tests).
tests/test_expert_demo_contract.py fixtures updated to provide
shape-appropriate metrics (no semantic change to those tests; same
12 cases still pin the ADR-0106 contract).
ADR-0109 status: Proposed -> Accepted. README sequencing updated
(ADR-0110 now only blocked by inference_closure, not by metric-shape
amendment).
Ledger: all five domains remain reasoning-capable, expert_demo=false.
Amends ADR-0106 \xc2\xa71.2 to dispatch threshold rules by lane shape rather
than imposing cognition-pack-shape metrics uniformly. ADR-0107
surfaced that every non-cognition lane was failing the gate by
absence-of-key, not by substance.
Status: Proposed. Ships five shapes covering every lane currently
attached to a ratified pack: cognition_shape, accuracy_shape,
inference_shape, refusal_shape, symbolic_logic_shape. Four invariants
pinned. Unknown lanes fail closed; new shapes require ADR amendment.
\xc2\xa71.1 (reasoning-capable prereq), \xc2\xa71.3 (signature scoping), \xc2\xa71.4
(domain-aware), \xc2\xa71.5 (replay byte-equality) all preserved. ADR-0106
status remains Accepted.
The ADR-0106 contract correctly refused promotion. ADR-0107 records the
deferral and reserves two follow-up ADRs:
- ADR-0109 (lane-shape-aware threshold amendment): ADR-0106 \xc2\xa71.2
prescribes cognition-pack-shape metrics uniformly, but math /
physics / systems / hebrew-greek lanes carry native shapes
(accuracy, passed_rate, all_pass_rate). Prerequisite for any future
expert-demo promotion.
- ADR-0110 (math re-attempt): conditional on ADR-0109 landing and
inference_closure substantively passing (currently all_pass_rate=0.4
on public).
tests/test_adr_0107_deferral.py pins adr_0107_no_silent_promotion: math
stays at reasoning-capable, has no expert_demo_claims entry, and the
ledger row carries a named refusal reason.
No change to core/capability/expert_demo.py or reporting.py -- the
contract is honored, not amended. README sequencing updated to reflect
ADR-0107 acceptance and the new ADR-0109/0110 prerequisites.
Closes ADR-0106 acceptance evidence:
- ExpertDemoClaim dataclass + additive expert_demo_claims block on
ReviewerRegistry (schema_version stays at 1; backward-compatible).
- New core/capability/expert_demo.py with derive_evidence_digest,
evaluate_expert_demo, collect_domain_lanes, materialise_lane_results.
- core/capability/reporting.py: replaces the cognition-lane-only
predicate (previous lines 418-433) with a domain-aware,
reviewer-signed gate; ledger rows now also carry
expert_demo_reason for operator legibility. Reviewer registry is
fail-closed: an unloadable registry yields zero claims, so a broken
registry never silently grants expert_demo=true.
- tests/test_expert_demo_contract.py covers all three ADR-0106
invariants: requires_signature, domain_aware, replay_byte_equality;
plus threshold + production-ledger-untouched gates. 12 new tests.
- tests/test_reviewer_registry.py extended with TestExpertDemoClaimsSchema
covering omitted block, valid parse, unknown signer rejection,
malformed digest rejection, duplicate domain rejection. 5 new tests.
- README index row + table preface updated to note expert_demo is
contract-gated. Frontier list trimmed (ADR-0106 has landed).
- ADR-0106 Status flipped Proposed -> Accepted.
No domain row's expert_demo field flips by this PR -- only the contract
changes. Promotion of any ratified domain requires a follow-up ADR
(ADR-0107 reserved for mathematics_logic) plus a signed claim.
- ADR-0108 Status: Proposed -> Accepted
- README index row updated to Accepted
- 'Current frontier' rewritten with the ranked Proposed-ADR list mandated
by ADR-0108 \xc2\xa7Decision; removes the now-false 'No ADR currently sits in
a "Proposed but unimplemented" state' sentence
- Open candidate directions (no-ADR-yet) section retained for the
multi-reviewer governance frontier item from ADR-0105
Makes the post-ADR-0105 sequencing of ADR-0080 / 0084 / 0087 / 0106
explicit, durable, and revisable. Status: Proposed. No content of the
four sequenced ADRs is modified — sequencing is meta, not content.
Defines a domain-aware, reviewer-signed expert_demo promotion gate to
replace the current cognition-lane-only predicate in
core/capability/reporting.py:418. Status: Proposed. This ADR does not
promote any domain — it defines the contract that a follow-up ADR (likely
mathematics_logic as ADR-0107) will consume as the first worked
promotion.
Sibling reconciliation PR to #104. The four ADRs explicitly called out as
the 'current implementation frontier' in PR #104 are already implemented
to the same evidence bar as the eight ADRs that PR accepted:
- ADR-0094: teaching/source.py + proposal schema widening + migration
script; tests/test_proposal_source.py green
- ADR-0095: teaching/from_miner.py + miner_loop_closure lane;
SHA-pinned in scripts/verify_lane_shas.py; tests/test_miner_proposals.py
green
- ADR-0098: core/demos/contract.py + adapter surface + demo_composition
lane; SHA-pinned; tests/test_demo_composition.py green
- ADR-0099: core/demos/showcase.py + public_demo lane;
SHA-pinned; tests/test_public_showcase.py green
Three of four lanes are SHA-pinned in CI (a stricter bar than several
already-accepted ADRs). Local pytest run: 85/85 passed across the four
tests/test_*.py files in 17s.
Also refreshes docs/decisions/README.md:
- flips the four table rows to Accepted (2026-05-22)
- rewrites the 'Current frontier' section now that no ADR-0091..0102
entry is unimplemented
- enumerates candidate next directions (curriculum proposals,
language-specific holdout splits, expert-demo ratification)
Docs-only change; no runtime code touched.
CLAIMS.md is now mechanically derived from two ground-truth sources:
- core.capability.ledger_report (Tier 1: ratified domains)
- scripts/verify_lane_shas.PINNED_SHAS (Tier 2: pinned lane reports)
The generator is deterministic and gated by
tests/test_claims_md_is_current.py + the lane-shas CI workflow's new
'verify CLAIMS.md is current' step. Drift between in-tree state and
the published claims fails CI before merge.
Tier 1 (5 ratified domains) and Tier 2 (6 pinned lanes) cover every
ADR-0092..0102 invariant currently CI-pinned.
Two pre-existing latent issues fixed:
1. discourse_planner flag catalog drift (test_flag_report failure)
On 2026-05-21 the discourse_planner default was flipped to True
after byte-equality verification (per inline comment in
core/config.py:130-138), but the capability flag catalog at
core/capability/reporting.py was not updated — it still claimed
"flag_shipped_default_off". The test
test_flag_report_tracks_default_off_flags_without_enabling_them
correctly caught the inconsistency; it had been failing across
every commit since ADR-0092 first ran the suite.
Fix:
- New "flag_shipped_default_on" state in _FLAG_CATALOG, added
to flag_report() grouped output
- discourse_planner moved from default_off → default_on
- Test renamed to test_flag_report_classification_matches_actual_defaults,
enforces BOTH directions of the contract (catalog claim must
match DEFAULT_CONFIG value)
- New test test_flag_catalog_state_is_consistent_with_default_config
cross-checks every catalog entry against DEFAULT_CONFIG;
catches future drift before it lands
2. public_demo lane SHA shifted every commit
Each commit advances the showcase's generated_at_revision field
(git HEAD SHA). _strip_volatile in the lane runner was stripping
wall-clock and per-run paths but NOT generated_at_revision, so
the byte-equality case's details.sha256 changed with every commit
even when underlying demos produced identical content. That made
the pin a "did this run today" check rather than a "did the code
produce the right artifact" check — exactly the failure mode
the verifier was supposed to prevent.
Fix:
- Add generated_at_revision to _VOLATILE_KEYS in the public_demo
runner. Lane's invariant is "same code → same SHA," not
"same HEAD → same SHA"; HEAD belongs in the showcase output
(operators need it) but not in the lane's equality projection.
- Pin refreshed once to capture the now-commit-independent SHA;
subsequent commits won't shift it unless underlying demo content
actually changes.
After fix:
- Capability tests: 6/6 passing (was 4/5 with discourse_planner failing)
- Lane SHAs: 6/6 match pinned values; public_demo pin will now survive
routine code changes
- Smoke 67/67, cognition eval byte-identical 100/100/100/100
This is the single known pre-existing test failure cleaned up.
Six lanes (reviewer_registry, miner_loop_closure,
domain_contract_validation, fabrication_control_summary,
demo_composition, public_demo) now have CI-enforced SHA-256 pins.
A failing job means a lane's deterministic output changed without
an explicit ADR-tracked pin update.
- new scripts/verify_lane_shas.py: single source of truth
- PINNED_SHAS dict mapping lane_id → 64-char hex SHA
- LANE_SPECS tuple wiring each lane to its runner module + canonical
report path
- accepts_report_flag handles the fabrication_control runner's
different arg shape (--lane-dir not --report)
- verify_all() runs each lane in subprocess isolation (clean Python
state per lane — relevant for adapters that cache pack loads at
module import)
- --update flag refreshes pins after intentional ADR-tracked changes;
diff is the audit trail
- --json flag emits machine-readable report
- exits non-zero on any mismatch
- new .github/workflows/lane-shas.yml:
- triggers on push to main and pull_request to main
- concurrency group cancels in-progress runs on new commits
- Python 3.11 + pip-cached deps + editable install
- runs verify_lane_shas.py; emits JSON report on failure
- 12-minute timeout (lanes take ~30s in practice)
- new tests/test_lane_sha_verifier.py: cheap local-pytest pinning
- every LaneSpec has a corresponding PINNED_SHAS entry
- no orphan pins without a LaneSpec
- every pin is a 64-char hex SHA-256
- every runner module path exists on disk
- canonical report paths are under repo root
- all six expected lanes (ADR-0092/0093/0095/0096/0098/0099) covered;
ADR-0094 and ADR-0097 are schema/ratification only, intentionally
excluded from EXPECTED_LANES
- 6 tests run in <100ms — catches drift before CI
- evals/public_demo/results/v1_dev.json: refreshed to match the new
pin (21751aaf..) — earlier pin was generated under slightly different
runner argparse defaults; --update produced the canonical bytes
Local verifier: 6/6 lanes match pinned SHAs. Smoke 67/67. Lane SHAs:
reviewer_registry 681a2aab..
miner_loop_closure 9f071733..
domain_contract_validation f9c06cde..
fabrication_control_summary 01e1b6b7..
demo_composition 27d83824..
public_demo 21751aaf..
Single 30-second artifact composing four CORE invariants
(determinism, honest unknown, reviewed learning, multi-hop with
trace) by delegating to existing DemoCommand adapters. **No new
mechanism** — every claim is backed by an already-shipped,
separately-tested adapter. Closes the 8-ADR scale-up slate.
- new core/demos/learning_loop_adapter.py: LearningLoopDemo wraps
ADR-0056 reviewed-teaching loop; _strip_volatile_paths drops
transient temp-dir paths from raw before serialization so the
adapter's report_sha256 is content-stable across runs
- new core/demos/showcase_adapters.py:
- FabricationControlPublicDemo: re-runs ADR-0096 public split,
produces 3 claims (refusal_recall_meets_threshold,
fabrication_rate_below_threshold, trace_evidence_present)
- MultiHopTraceDemo: runs 'Does light reveal truth?' with
transitive_surface=True + composed_surface=True against
cognition pack; surfaces a 3-hop walk light→truth→knowledge→
evidence; produces 3 claims (grounded_answer, depth_two_or_more,
walk_evidence_present)
- new core/demos/showcase.py: run_showcase() composes 4 scenes,
emits showcase.json + per-scene artifacts; render_html() produces
presentation-only static HTML with no JS injection vector;
ShowcaseScene dataclass; MAX_RUNTIME_SECONDS=30 hard ceiling
with DemoContractError if exceeded
- CLI: 'showcase' added to demo target choices; --output-dir flag
added; cmd_demo dispatch branch writes showcase.json + showcase.html
- new evals/public_demo/ lane with 4 cases:
- all_claims_supported (each scene + composite)
- determinism_run_to_run_byte_equality (two runs identical after
stripping volatile keys: total_runtime_ms, json_path,
transient_corpus)
- runtime_under_budget (≤30s)
- pure_composition_no_new_mechanism (grep gate over showcase
imports — must come from core/chat/generate/language_packs/
teaching/evals or allowed stdlib only)
- lane is itself byte-identical across runs (sha256 5707db8efc6a..);
runtime case omits exact runtime_ms (it varies near bucket
boundaries) but still asserts ≤ budget
- 8 unit tests with module-scoped fixture (showcase runs once,
~13s total) covering payload shape, scene order, runtime budget,
HTML render absence of <script>, and the pure-composition import
gate independently of the lane
- ADR-0099 measured: total_runtime_ms ~12.8s, well under 30s budget
- smoke 67/67, cognition eval byte-identical 100/100/100/100;
all 6 ADR-0092..0099 lanes byte-identical:
reviewer_registry 681a2aab..
miner_loop_closure 9f071733..
domain_contract_validation f9c06cde..
fabrication_control sum 01e1b6b7..
demo_composition 27d83824..
public_demo 5707db8e..
DemoCommand Protocol + thin adapters retrofit shipped tours to a
typed composition contract. Composability becomes a structural
property: the ADR-0099 showcase will consume DemoResult through one
stable type rather than special-casing each tour. No demo behavior
changes — adapters wrap underlying run_tour() entry points.
- new core/demos/ package:
- contract.py: frozen Claim / DemoResult dataclasses, runtime-checkable
DemoCommand Protocol, canonical_json() sanctioned serializer
(sorted keys, 2-space indent, trailing newline), CLAIM_CONTRACT_VERSION
- audit_tour_adapter.py: AuditTourDemo (5 claims from ADR-0042 scenes
1-4: identity_pack_swaps_visible, safety_typed_refusal,
ethics_opt_in_deployment_fires, ethics_default_silent,
replay_byte_identical)
- tour_adapters.py: shared pattern for register/anchor-lens/orthogonality
tours; _extract_claims walks the dict tree for *_supported booleans
and builds Claim objects in deterministic sorted order
- global-state-mutation detector (ADR-0098 invariant #2):
capture_state() snapshots a load-bearing subset of process state
(CORE_* env vars + module identities for chat.telemetry,
chat.runtime, language_packs.compiler);
verify_no_global_state_mutation() ignores None→id transitions
(benign lazy import) and only flags env-var changes or module
identity rebindings
- new evals/demo_composition/ lane (ADR-0098 invariant proving):
- 6 cases asserting byte-equality + no-state-mutation across the
three fast adapters (audit-tour, register-tour, orthogonality-tour)
- composition_read_only: confirms two adapter results compose into
a composite claim set without mutating either
- stateful_fixture_rejected: negative control — a deliberately
stateful adapter MUST trigger divergence detection
- anchor-lens-tour adapter is exercised by tests, not the lane,
to keep wall time bounded
- byte-identical across runs (sha256 27d838241bf3..)
- 26 unit tests covering Claim/DemoResult validation, canonical_json
determinism, state-mutation detector (including the lazy-import
benign case), Protocol conformance (isinstance check + claim
contract version) for all four adapters, seed-rejection per
adapter (all current adapters are fully deterministic), and an
audit-tour integration smoke verifying 5 claims + byte-equality +
no state mutation across two consecutive runs
- smoke 67/67, cognition eval byte-identical 100/100/100/100, all
five lanes byte-identical (reviewer_registry 681a2aab..,
miner_loop_closure 9f071733.., domain_contract_validation f9c06cde..,
fabrication_control summary 01e1b6b7.., demo_composition 27d83824..)
First concrete domain claim under ADR-0091's Domain Pack Contract v1.
en_mathematics_logic_v1 is now formally ratified as reasoning-capable
in the capability ledger: 9/9 ADR-0091 predicates pass.
ADR-0097 §"No code changes outside pack artifacts and corpus" relaxed
to include two latent bug fixes that ADR-0093's predicate enforcement
just exposed:
1. language_packs/schema.py: LanguageRole enum widened to include
DOMAIN_SEED. Three in-tree packs (en_mathematics_logic_v1,
en_physics_v1, en_systems_software_v1) have declared role="domain_seed"
since landing but the enum was never updated; load_pack() always
raised on them. ADR-0093's P1 predicate exposed the mismatch.
2. core/capability/domain_contract_predicates.py: P2 (gloss checksum)
was reading manifest["checksums"]["glosses_sha256"]; the canonical
in-tree location is manifest["glosses_checksum"] (top-level). Fixed
to prefer the canonical key and fall back to the nested form for
forward compatibility.
ADR-0097 manifest additions to en_mathematics_logic_v1:
- domain_contract_version: 1
- domain_id: "mathematics_logic"
- axioms: null (rules in v1 — pack proves reasoning via chain
composition, not declarative axioms)
- rules: null
- teaching_chains: ["mathematics_logic_chains_v1"]
- eval_lanes: three lanes with dev/public/holdout (elementary_mathematics_ood,
inference_closure, fabrication_control)
- reviewers: ["shay-j"] (resolved via ADR-0092 registry)
- known_gaps: [] (all math/logic gaps in docs/gaps.md were [x])
- provenance: "adr-0097:reviewed:2026-05-21"
Verified evidence:
- core capability domain-contract --pack-id en_mathematics_logic_v1
→ all_passed=True (P1-P9 all pass)
- core capability ledger → mathematics_logic row shows
status=reasoning-capable, predicates.reasoning_capable=True,
predicates.expert_demo=False, open_gaps=[],
operator_chain_coverage all ready=True (8 chains each),
intent_shapes_present=5
- 14 ADR-0097 invariant tests in
test_adr_0097_mathematics_logic_ratification.py pin
status/provenance/expert-demo-gate/contract shape
Two pre-existing tests updated for the new CLI default
(predicate-running, non-zero on missing contract):
- test_capability_domain_contract_json_absent_contract_is_noop now
uses --structural-only to assert legacy parse-only shape
- test_cli_returns_nonzero_on_missing_contract switched its fixture
pack from en_mathematics_logic_v1 (now has a contract) to
en_core_cognition_v1 (no contract)
The pre-existing test_flag_report_tracks_default_off_flags failure
(discourse_planner flag default mismatch, seen since ADR-0092) is
unchanged and unrelated.
Smoke 67/67, packs 6/6, capability tests 49/50, cognition eval
byte-identical 100/100/100/100; lanes byte-identical:
reviewer_registry 6/6, miner_loop_closure 6/6,
domain_contract_validation 9/9, fabrication_control dev 12/12 +
public 9/9.
First negative-control measure. Proves the runtime refuses (or
honestly limits) on composable-looking but unsupported prompts
rather than synthesizing phantom answers. Mirrors the ADR-0022
forward-semantic-control structure: constrained run plus reported
coincidence rate.
- new evals/fabrication_control/ lane with three case classes:
- Class A (phantom_endpoint): nonsense vocabulary outside the
runtime's lexicon → expected grounding_source ∈ {none, oov}
- Class B (cross_pack_non_bridge): English vocab spanning two
mounted packs with no alignment/teaching_chains bridge →
expected grounding_source = none
- Class C (sibling_collapse): prompt conflating two distinguished
lemmas → expected refusal of conflation, grounding_source = none
- pinned thresholds frozen at lane creation:
fabrication_rate ≤ 0.01, refusal_recall ≥ 0.95,
trace_evidence_present == 1.00,
grounding_source_matches_expected == 1.00
- three-set discipline per docs/capability_roadmap.md Rule 1:
cases/dev.jsonl (12 cases, 4/class), cases/public.jsonl (9 cases),
cases/holdout.jsonl (empty — reserved for first version cut)
- runner.py drives each case through ChatRuntime.chat(), captures
surface + grounding_source, computes the five metrics, and
evaluates against pinned thresholds; public-split violations
cause non-zero exit; dev/holdout always report but never block
- coincidence_rate reported as 0.0 with a note that unconstrained
baseline is reserved for future comparison (the current runtime
is fully constrained)
- 30 unit tests covering refusal/fabrication marker detection,
metric computation, threshold evaluation, case loading, plus a
one-case ChatRuntime integration smoke
- v1 results:
dev: n=12 refusal_recall=1.0 fabrication_rate=0.0 PASSED
public: n=9 refusal_recall=1.0 fabrication_rate=0.0 PASSED
- byte-identical across runs (dev sha256=d6757e0e3f96..,
public sha256=9b502878fcb7.., summary sha256=01e1b6b71114..)
- smoke 67/67, teaching 17/17, cognition 120/121 (pre-existing skip);
cognition eval byte-identical 100/100/100/100
Closes the Phase-5 contemplation loop in code. Articulation-quality,
contradiction-detection, and frontier-compare miners (already shipping)
now have a route to file PackMutationProposal candidates that traverse
the single reviewed teaching path. Construction-only; never promotes
to coherent.
- new teaching/from_miner.py: from_finding() / from_findings() turn
ContemplationFinding records (kind=PACK_MUTATION_CANDIDATE) into
PackMutationProposal candidates with source.kind="miner",
source.source_id=<miner_id>, status=SPECULATIVE
- proposal_id = SHA-256(canonical(miner_id, finding, revision))[:16]
— same inputs → byte-identical proposal_id; different miner_id or
revision → different id
- identity-pack defense AT CONSTRUCTION: reuses teaching.review.
_is_identity_override() against finding.subject AND
finding.proposed_action; miner-sourced identity-override attempts
never reach the proposal log
- pluggable ReplayEquivalenceChecker Protocol with ReplayEquivalenceResult;
NoOpReplayChecker default explicitly notes "deferred to production
checker"; production checker integration is downstream of this ADR
- from_findings() batch path collects identity-override and
replay-equivalence rejections in a typed rejection log rather than
raising, so a mixed batch can proceed with audit evidence
- serialize_proposal_emitted_event() emits ADR-0040-compliant redacted
telemetry shape: type, proposal_id, source.serialize(),
epistemic_status only (no raw subject/correction_text)
- 22 unit tests covering positive construction, identity defense in
subject+proposed_action, malformed input, determinism (same inputs,
different revision, different miner_id, batch stream), replay
pre-gate (single + batch), telemetry redaction, and the structural
grep gate enforcing miner_proposal_single_review_path (only
teaching/review.py and teaching/store.py may promote to COHERENT)
- new evals/miner_loop_closure/ lane: 6 case classes (positive_basic,
identity_override_subject, identity_override_action,
replay_equivalence_failed, wrong_finding_kind, determinism) passing
6/6 with byte-identical SHA-256 across runs
- smoke 67/67, teaching 17/17, cognition 120/121 (1 pre-existing skip);
cognition eval byte-identical 100/100/100/100
Closes the load-bearing gap blocking every reasoning-capable claim
under ADR-0091: docs/reviewers.yaml was previously `reviewers: []` and
unparsed. Now schema-validated at v1, with a bootstrap shay-j entry
self-sealed via provenance.
- new core.capability.reviewers module: frozen Reviewer/ReviewerRegistry
dataclasses, strict load_reviewer_registry parser, ReviewerRegistryError
- enforces ADR-0092 schema rules: schema_version==1, no unknown
top-level keys, no unknown reviewer fields, role∈{primary,domain},
primary must claim ["*"], domain must NOT claim "*", review_scope
subset of {pack,proposal,chain,eval}, no duplicate reviewer_ids
- can_review(reviewer_id, domain_id, scope) helper implements
ADR-0092 rules 2-4 for downstream use by ADR-0093 validator
- docs/reviewers.yaml updated to v1 schema with shay-j bootstrap
- ledger_report() evidence_counts now exposes structured
reviewer_registry status (valid, schema_version, reviewer_count,
reviewer_ids, error) alongside the legacy reviewers_present bool
- new evals/reviewer_registry/ lane: 6 cases (2 positive + 4 negative)
covering empty-registry, wrong-version, domain-wildcard rejection,
and unknown-field rejection
- runner emits deterministic JSON report; two runs produce byte-identical
output (sha256 verified)
- 26 unit tests in tests/test_reviewer_registry.py
- capability ledger test extended to assert new reviewer_registry block
- smoke suite green (67/67); lane passes 6/6
The pre-existing test_flag_report_tracks_default_off_flags failure is
unrelated (discourse_planner flag default) and not introduced here.
Eight load-bearing ADRs closing the loop from contemplation Phase 5 through
a public showcase demo. Each one is small and evidence-bearing; together
they sequence the next arc without duplicating existing substrate.
- 0092 Reviewer Registry v1 — populates docs/reviewers.yaml schema;
unblocks all reasoning-capable claims under ADR-0091.
- 0093 Domain Pack Contract v1 Implementation — wires ADR-0091's five
follow-up items (parser, dry-run validator, chain registry, eval lane
refs, reviewer resolution) so manifest fields actually gate status.
- 0094 Proposal Source Provenance — sealed ProposalSource type widening
proposal schemas ahead of 0095.
- 0095 Miner-Sourced Teaching Proposals — closes the contemplation
loop: articulation_quality / contradiction_detection / frontier_compare
miners emit PackMutationProposal candidates routed through the single
reviewed teaching path; identity-pack defense at construction, not
review; replay-equivalence pre-gate.
- 0096 Fabrication-Control Eval Lane — first negative-control measure;
three case classes (phantom endpoint, cross-pack non-bridge, sibling
collapse) with frozen thresholds (fabrication_rate ≤ 0.01).
- 0097 Mathematics-Logic Reasoning-Capable Ratification — first
domain claim under ADR-0091; chain corpus + eval lanes already
exist, this is the formal contract ratification.
- 0098 Demo Composition Contract — DemoCommand protocol so demos can
be composed without reimplementation; deterministic JSON, no global
state mutation, declared output paths only.
- 0099 Public Showcase Demo — composes four scenes (determinism /
honest unknown / reviewed learning / multi-hop+trace) under 30s;
pure composition enforced by grep gate; JSON byte-equality CI-pinned.
Landing order: 0092 → 0094 → 0095 → 0093 → 0096 → 0097 → 0098 → 0099.
Deliberately not included: curriculum compiler, formation course
runner, calculator operators, response-mode taxonomy expansion,
learning-scale 10k harness. Each is deferred with a documented reason.
Phase 5 landed in commit 327047c (articulation-quality miner +
runtime sink wiring + full end-to-end loop tests). Extending the
session note in-place per its own append-only convention so the
single document covers the complete arc Phases 1–5.
Sections updated
----------------
* §0 executive summary
- commit count: 9 → 11
- phases shipped: 4 → 5 (new Phase 5 row in the deliverables
table)
- observation surfaces table grows two rows for
``attach_articulation_sink`` and
``mine_articulation_observations``
- test artifacts: 6 → 8 files, 64 → 82 cases
* §3.5 NEW — full architectural walkthrough of Phase 5
- Why the loop closes (links the user's
"memory confidence scoring" intuition to ADR-0080's
doctrine-aligned realisation: reviewable evidence, not
autonomous mutation)
- File-by-file delta (chat/articulation_telemetry.py + miner
+ runtime wiring)
- Three v1 mining rules (recurring_predicate_monotony /
recurring_planner_gap / low_average_predicate_diversity)
- Loop diagram showing live + offline halves
- Recorded demo output from the commit message
- Doctrine pin table mapping each constraint to its test
* §4 pipeline diagram extended to show Phase 5 sink + offline
miner branches
* §5 verification table gains four new rows for Phase 5 claims
(full-loop emission, byte-equal finding IDs across two e2e
runs, JSONL round-trip identity, opt-in gating)
* §5.6 suite totals updated:
- Contemplation subsuite: 35/35 → 53/53 (Phase 3+4+5)
- New row for Phase 5 articulation-quality e2e (7/7)
* §6 case study — added the "After Phase 5" trace and the
closing one-line story across all five phases for one prompt
("What is truth, and why does it matter?")
* §7 architecture surfaces table grows a row for
chat/articulation_telemetry.py and adds the miner to the
contemplation subsystem row
* §9 inverted from "what would close the loop" (future work) to
"SHIPPED — here's what it now unlocks":
- production sink + retention policy
- additional aggregation rules
- CLI hook
- review-loop wiring back into PackMutationProposal
* §10 reference index grows new lines for
chat/articulation_telemetry.py,
core/contemplation/miners/articulation_quality.py,
tests/test_articulation_quality_miner.py, and
tests/test_articulation_quality_e2e.py
* Footer updated: notes the arc is complete; future arcs should
start a new session-notes file and cross-link rather than
rewriting this one.
The session-notes file is now 1100+ lines — the complete frozen
reference for the articulation arc that took CORE from one-sentence
pack-grounded surfaces to a full live-reasoning + offline-mining
+ reviewable-proposals feedback loop, all doctrine-aligned, all in
one session.