Define the long-term architectural posture for CLOSE-derived facts and FrameVerdict as deliberate non-interaction.
Adds the ratification artifact and updates runtime contracts to preserve the open/proposal/review lane separately from the closed-world FrameVerdict lane, with INV-30/INV-31 and pillar references.
PR: #795