The docs/proposal-artifact-substrate-v1 work (#727) — wave-m-consolidation-b3.5, core-logos-studio-plan, proposal-artifact-substrate-v1 — is the authoritative consolidation and supersedes the parallel 'Phase A' I'd just drafted. Reconciling to one source of truth: - FOLD IN the one genuine gap b3.5 missed (a design review caught it): the Calibration centerpiece undersells — the reader reads the sub-N_MIN committed practice report.json, so on live data no class shows licensed, while the earned state (additive 95/5/100, PROPOSE-licensed) sits in the disagreeing ratification_queue.json. Added as a diagnosis addendum + a Deliverable-2 acceptance criterion (make the committed practice artifacts coherent; show ≥1 earned class). Data-side fix, not a re-derivation. - FOLD IN the grouped-navigation idea: a field on the route registry (Deliverable 1) + the organism's-loop grouping (Converse/Cognition/Evidence/ Determinism/Discipline/Substrate/Settings), with the correction that 'core-logos' is the language/manifold Studio surface, not the cognition cluster. - REDIRECT wave-M-worthiness.md's consolidation section to point at b3.5 instead of defining a parallel Phase A. - SCRAP duplicates: wave-M-phaseA-briefs (duplicated b3.5) and workbench-ui-ux-guide-brief (superseded by b3.5 Deliverable 4). |
||
|---|---|---|
| .. | ||
| phase-3b-4-skeleton | ||
| ADR-0084-pack-content-brief.md | ||
| ADR-0085-content-style-pass-brief.md | ||
| ADR-0085-content-style-pass-v2-brief.md | ||
| ADR-0167-FOLLOWUPS.md | ||
| ADR-0167-PARALLEL-WORK-PLAN.md | ||
| ADR-0167-W2C-cross-domain-audit.md | ||
| ADR-0172-TIER1-BRIEF-PACK.md | ||
| ADR-0174-PHASE-3B-4-COMBINED-SCOPE.md | ||
| arithmetic-comprehension-via-binding-graph-2026-06-05.md | ||
| AUDIT-ADR-0178-GB1-GB2.md | ||
| AUDIT-ADR-0179-EX-RECONCILE.md | ||
| BACKLOG-everyday-atoms-grounding-pack.md | ||
| BRIEF-11-phase-2-reader-closure-and-capability-snapshot.md | ||
| CHATGPT-REMOTE-BRIEF.md | ||
| CLEANUP-C2-run-lane-migration.md | ||
| CLEANUP-C4-compositions-compile.md | ||
| CODEX-domain-pack-closure-cleanup-brief.md | ||
| CODEX-greek-hebrew-content-phase-ii-brief.md | ||
| COMPOSITION-FRAME-CONSUMPTION-WIRING-BRIEF.md | ||
| COMPOSITIONCLAIM-BRIEF-PACK.md | ||
| COMPREHENSION-READER-AUDIT.md | ||
| CONSUMPTION-WIRING-DISPATCH-PACK.md | ||
| DCS-S1-FINDING.md | ||
| discrete_count_statement-injector-spec.md | ||
| MATCHER-EXTENSION-DISPATCH-PACK.md | ||
| ME1-ME5-MILESTONE.md | ||
| NEXT-SUBJECTS-CHATGPT-HANDOFF.md | ||
| PARALLEL-WORK-PLAN-2026-05-29.md | ||
| PHASE-3.1-FOLLOWUP-RECOGNIZER-EXPANSION.md | ||
| POST-RAT1-PARALLEL-BRIEFS.md | ||
| RB-GSM-SOLVER-DESIGN-INPUT.md | ||
| sealed-measurement-obligation-2026-06-04.md | ||
| SEMANTIC-STATE-TRANSITION-BLUEPRINT.md | ||
| stage-c-composition-investigation-2026-06-03.md | ||
| TIER2-AND-FRAMECLAIM-BRIEF-PACK.md | ||
| VERB-EXPANSION-DISPATCH-PACK.md | ||
| wave-1-evidence-spine-briefs-2026-06-12.md | ||
| wave-M-phaseB-calibration-briefs-2026-06-13.md | ||
| WAVE-NEXT-REVISED.md | ||
| wave-R-mastery-briefs-2026-06-12.md | ||
| wave-R2-backend-brief-2026-06-12.md | ||
| wave-R2-route-briefs-2026-06-12.md | ||
| wave-R2-route-briefs-part2-2026-06-12.md | ||
| wave-R3-briefs-2026-06-13.md | ||
| WORKBENCH-UI-WAVE-BRIEF-PACK.md | ||
| WORKBENCH-UI-WAVE-SCOPING.md | ||
| WORKBENCH-W3-RATIFICATION-CORRIDOR-BRIEF.md | ||