Two D10-pattern acceptance packets submitted for Joshua's ruling:
- docs/audit/adr-0244-acceptance-packet-2026-07-17.md
- docs/audit/adr-0245-acceptance-packet-2026-07-17.md
Each is an evidence dossier (§1 claim→built→evidence→verdict table, §2 deviations,
§3 deferred, §4 gate results, §5 requested action). §8 RULING RECORD is PENDING and
both ADR status lines remain **Proposed** — the anti-self-Accept guard forbids me
flipping status without explicit ratification, so I have NOT.
The ADR-0244 packet §5 foregrounds the one caveat shaping the ruling: the identity
wave-gate is BUILT + VALIDATED but NOT live (identity_wave_gate=False; Phase-3
live-non-separation, best balanced error 0.346) — validated scaffolding pending
ADR-0246, not a live gate. The ADR-0245 §3 gate is complete (parity, f32 467×
speedup, 0-LAPACK, collision-resistance).
Plan doc Phase 6 → PACKETS DELIVERED, awaiting ratification. All build phases
(0-5) complete; the only remaining step is the human ratification gate.
[Verification]: Phase 5 gate green — smoke 176; fast lane 12032 passed / 25
skipped (core_rs built → Rust-parity + f32-speedup ran live). Docs-only commit;
both ADRs Proposed (provenance guard unaffected).