Six dispatchable briefs covering the next-progress path on GSM8K (correct from 3 → 10+, ADR-0163 Round-1 gate). Wave A — four parallel recognizer-injector PRs: - A1 currency_amount → Sonnet (2-4 cases lift) - A2 rate_with_currency → Opus (schema decision required) - A3 multiplicative_aggregation → Sonnet (first CandidateOperation) - A4 temporal_aggregation → Sonnet (structural sanity) Wave B — orchestrator-handled inline: - B1 lexical-entry closure for 3 remaining cases Wave D — sequential after A2 lands: - D1 ADR-0169 CompositionClaim scoping → Opus Optional background: - Gemini recognizer registry audit (GPT-5.5 Task 3 unclaimed) Dispatch gated on the #362→#366 cascade fully merging. Codex is offline (rate limits); allocation reflects Sonnet + Opus + Gemini. Each brief carries explicit case 0050 hazard pins, narrow-form constraints, wrong=0 verification commands, and report-back questions. |
||
|---|---|---|
| .. | ||
| adr | ||
| architecture | ||
| audit | ||
| briefs | ||
| curriculum | ||
| decisions | ||
| evals | ||
| handoff | ||
| handoffs | ||
| implementation | ||
| plans | ||
| sessions | ||
| workbench | ||
| admissibility-exemplars.md | ||
| capability_roadmap.md | ||
| ethics_packs.md | ||
| EVAL_AUDIT_2026-05-20.md | ||
| eval_methodology.md | ||
| formation_pipeline_plan.md | ||
| frontier_baselines.md | ||
| gaps.md | ||
| hitl-backpressure.md | ||
| holdout_recipients.txt | ||
| identity_packs.md | ||
| master-plan-post-substrate-audit.md | ||
| pack_inventory_2026-05-21.md | ||
| PROGRESS.md | ||
| recognizer-registry.md | ||
| refusal-taxonomy.md | ||
| reviewers.yaml | ||
| runtime_contracts.md | ||
| RUST.md | ||
| safety_packs.md | ||
| teaching_order.md | ||
| test-debt-quarantine.md | ||
| truth_seeking_schema.md | ||
| Whitepaper.md | ||
| Yellowpaper.md | ||