| .. |
|
adr
|
feat(runtime): opt-in unified-ingest path (ADR-0090, audit Findings 6+7) (#95)
|
2026-05-20 21:00:27 -07:00 |
|
analysis
|
test(derivation): add ADR-0184 semantic replay equivalence harness
|
2026-06-10 14:35:22 -07:00 |
|
architecture
|
docs: add edge sync completion status
|
2026-05-29 19:50:44 -07:00 |
|
audit
|
audit(l10-l11): lookback review lived spine
|
2026-06-05 15:52:40 -07:00 |
|
brief
|
Add Brain Corp technical brief
|
2026-06-02 12:07:32 -07:00 |
|
briefs
|
feat(W-019): learning-arc demo — engine-authored proposal from contemplation (ADR-0152) (#276)
|
2026-05-25 13:03:10 -07:00 |
|
curriculum
|
feat(packs): reland en_core_syntax_v1 foundation vocabulary (collision-audited)
|
2026-05-31 16:18:26 -07:00 |
|
decisions
|
feat(teaching): ADR-0218 P3 — proof-carrying coherence promotion
|
2026-06-11 17:02:45 -07:00 |
|
evals
|
docs(evals): articulation benchmark preamble — discourse-planner spine
|
2026-05-19 12:47:38 -07:00 |
|
handoff
|
docs(workbench): R0a CI path filter includes the workflow file itself
|
2026-06-12 10:29:29 -07:00 |
|
handoffs
|
docs(handoff): Brief 11 — Phase 2 reader closure + capability snapshot sequencing (#342)
|
2026-05-27 05:03:40 -07:00 |
|
implementation
|
docs: propose semantic-symbolic binding graph layer (#170)
|
2026-05-23 09:58:39 -07:00 |
|
issues
|
feat(teaching): ADR-0218 P3 — proof-carrying coherence promotion
|
2026-06-11 17:02:45 -07:00 |
|
lab
|
Add passive tabletop lab protocol
|
2026-06-06 12:37:57 -07:00 |
|
planning
|
fix(demo): harden epistemic truth-state authority — sealed corpus + entailment-decided inference
|
2026-06-11 23:38:03 -07:00 |
|
plans
|
Add sensorium compiler law and tile vision
|
2026-06-03 19:58:36 -07:00 |
|
research
|
docs(research): select quantitative field reasoner wedge
|
2026-06-04 17:23:57 -07:00 |
|
sessions
|
docs(scoping): epistemic disclosure bus (Stage 2 / VERIFIED v1) + Q1 question-articulation briefs
|
2026-06-08 14:53:47 -07:00 |
|
workbench
|
feat(workbench): add R2 backend read substrate
|
2026-06-12 12:49:41 -07:00 |
|
zig
|
Merge pull request #511 from AssetOverflow/feat/adr-0180-crdt-contract-lock
|
2026-05-31 20:30:26 -07:00 |
|
admissibility-exemplars.md
|
feat(ADR-0163.B.2): four new exemplar corpora — discrete_count_statement, multiplicative_aggregation, currency_amount, plus temporal_aggregation v2 widening (#306)
|
2026-05-26 14:36:59 -07:00 |
|
audio_pipeline_overview.md
|
docs(adr-0183): stub ADR for the lawful audio→lexeme path
|
2026-05-29 14:02:40 -07:00 |
|
capability_roadmap.md
|
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
|
2026-05-22 20:39:24 -07:00 |
|
claims_ledger.md
|
Merge pull request #546 from AssetOverflow/docs/reconcile-current-state-2026-06-03
|
2026-06-04 07:14:39 -07:00 |
|
ethics_packs.md
|
feat(adr-0034): EthicsCheck — structural surface parallel to SafetyCheck
|
2026-05-17 20:46:34 -07:00 |
|
EVAL_AUDIT_2026-05-20.md
|
chore(evals): contracts + bench json + Lane B viewer + chart + audit + demo schema (#62)
|
2026-05-20 13:53:13 -07:00 |
|
eval_methodology.md
|
feat: ADR-0113 rename expert-demo → audit-passed; reserve expert namespace (ADR-0114 GSM8K roadmap)
|
2026-05-22 15:36:10 -07:00 |
|
formation_pipeline_plan.md
|
docs: teaching-order doctrine + refresh formation/roadmap status
|
2026-05-17 18:48:44 -07:00 |
|
frontier_baselines.md
|
feat(evals): frontier structural-zero baselines for Phase 2 v1 lanes
|
2026-05-16 12:45:28 -07:00 |
|
gaps.md
|
Add chain-first capability ledger and domain seeds (#97)
|
2026-05-20 21:33:24 -07:00 |
|
hitl-backpressure.md
|
feat(ADR-0161.3): submission-time invariants — duplicate + dependent_on_pending auto-reject (#313)
|
2026-05-26 16:46:25 -07:00 |
|
holdout_recipients.txt
|
feat: ADR-0119.1 — seal fabrication_control holdout with age encryption (Obligation #1)
|
2026-05-22 17:22:46 -07:00 |
|
identity_packs.md
|
feat(surface): ADR-0031 — score-decomposition surface (per-axis hedges)
|
2026-05-17 20:16:22 -07:00 |
|
master-plan-post-substrate-audit.md
|
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305)
|
2026-05-26 13:49:08 -07:00 |
|
memo.html
|
memo: tighten for Karpathy + Anthropic exec audience
|
2026-06-10 16:10:47 -07:00 |
|
model_dependency_size_tally.md
|
docs: start running model & dependency size tally
|
2026-05-29 13:51:30 -07:00 |
|
pack_inventory_2026-05-21.md
|
docs: pack inventory 2026-05-21 — strengths, weaknesses, leverage gaps (#84)
|
2026-05-20 19:59:18 -07:00 |
|
position_paper.md
|
fix(demo): harden epistemic truth-state authority — sealed corpus + entailment-decided inference
|
2026-06-11 23:38:03 -07:00 |
|
PROGRESS.md
|
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305)
|
2026-05-26 13:49:08 -07:00 |
|
recognizer-registry.md
|
feat(ADR-0163.D): wire ratified RecognizerSpecs into math_candidate_graph admissibility surface (#302)
|
2026-05-26 13:11:47 -07:00 |
|
refusal-taxonomy.md
|
feat(ADR-0163.A): refusal taxonomy lane — shape categorization of GSM8K admissibility gaps (#297)
|
2026-05-26 11:27:11 -07:00 |
|
reviewers.yaml
|
docs(claims): ADR-0200 reconciliation — expert claim to audit-passed truth
|
2026-06-02 10:06:16 -07:00 |
|
runtime_contracts.md
|
feat(runtime): read-only proposal-review sub-pass in idle_tick (IT-b)
|
2026-06-07 22:32:20 -07:00 |
|
RUST.md
|
Activate and verify Rust backend
|
2026-05-13 22:23:48 -07:00 |
|
safety_packs.md
|
feat(safety): ADR-0032 — SafetyCheck structural surface
|
2026-05-17 20:25:22 -07:00 |
|
teaching_order.md
|
feat(identity-packs): ADR-0027 — swappable identity manifold via packs
|
2026-05-17 19:24:39 -07:00 |
|
test-debt-quarantine.md
|
ci: full-pytest gate + QUARANTINE registry (49 known failures, uv) (#263)
|
2026-05-25 06:21:04 -07:00 |
|
truth_seeking_schema.md
|
feat(epistemic): contradiction coherence checker — CONTESTED transitions wired, last Tier 4.5 row closes
|
2026-05-17 10:36:48 -07:00 |
|
Whitepaper.md
|
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
|
2026-05-22 20:39:24 -07:00 |
|
Yellowpaper.md
|
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
|
2026-05-22 20:39:24 -07:00 |