Reading the actual gate logic (product_bridge/pool/verify) corrected §5's sequencing optimism, before merge: - The safe wire is already done (product_bridge at :530); its safety is a two-token target whitelist (money+make/earn, weight+total/move) hardcoded to 0003/0021 — it generalizes nothing. - Verified live (2026-06-03): the general composer resolve_pooled refuses ALL ten R1/R4/R5/R6 corpus positives (R1/R4 build zero candidates; R5 only wrong ones) -> wiring yields +0 correct; and it wrong-commits 0016 -> 510, so wiring it wholesale is a live wrong=0 regression the disagreement rule does not catch. So WIRING and COMPOSITION are the same task: composer production per shape, each behind a structural promotion gate (extract_target + target_units, not disagreement alone); the wire is the trivial last step. Core ratification (freeze, design-of-record, gates, sealed-set measurement) unchanged. |
||
|---|---|---|
| .. | ||
| adr | ||
| analysis | ||
| architecture | ||
| audit | ||
| brief | ||
| briefs | ||
| curriculum | ||
| decisions | ||
| evals | ||
| handoff | ||
| handoffs | ||
| implementation | ||
| plans | ||
| research | ||
| sessions | ||
| workbench | ||
| zig | ||
| admissibility-exemplars.md | ||
| audio_pipeline_overview.md | ||
| capability_roadmap.md | ||
| claims_ledger.md | ||
| ethics_packs.md | ||
| EVAL_AUDIT_2026-05-20.md | ||
| eval_methodology.md | ||
| formation_pipeline_plan.md | ||
| frontier_baselines.md | ||
| gaps.md | ||
| hitl-backpressure.md | ||
| holdout_recipients.txt | ||
| identity_packs.md | ||
| master-plan-post-substrate-audit.md | ||
| model_dependency_size_tally.md | ||
| pack_inventory_2026-05-21.md | ||
| position_paper.md | ||
| PROGRESS.md | ||
| recognizer-registry.md | ||
| refusal-taxonomy.md | ||
| reviewers.yaml | ||
| runtime_contracts.md | ||
| RUST.md | ||
| safety_packs.md | ||
| teaching_order.md | ||
| test-debt-quarantine.md | ||
| truth_seeking_schema.md | ||
| Whitepaper.md | ||
| Yellowpaper.md | ||