core/docs/sessions
Shay a7eb123579 docs(session): amend servability-blade note — reconcile with ADR-0206, no parallel substrate
The 2026-06-08 practice-attempts/servability-blade session note under-referenced the substrate
that already ships the serving half of its design. Doctrine ('wrong=0 = no false presentation of
epistemic status') stands; the build plan must reuse existing organs, not fork parallel ones.

Adds a binding Amendment + reframes sequencing:
- ServabilityDecision/ServabilityBlade => advance ADR-0206 core/response_governance/ (ReachPolicy /
  govern_response / shape_surface, ReachLevel STRICT<APPROXIMATE<EXTRAPOLATE<CREATIVE, gated STRICT,
  already disclosing [approximate]) — NOT a new object.
- the epistemic_state Literal => reuse core.epistemic_state.EpistemicState (ratified taxonomy), not
  a smaller renamed enum.
- ProblemAttemptSession => extend core/comprehension_attempt/, don't fork.
- first activation = produce reserved VERIFIED via canonical comparison (scoping doc already exists),
  consume through govern_response/shape_surface, prove on the yardstick, one state at a time.

Preserves the research trail (amendment, not rewrite). Docs only.
2026-06-08 07:50:27 -07:00
..
2026-06-08-practice-attempts-and-servability-blade.md docs(session): amend servability-blade note — reconcile with ADR-0206, no parallel substrate 2026-06-08 07:50:27 -07:00
SESSION-2026-05-13.md
SESSION-2026-05-15-capability-gates.md feat(evals): Phase 0 — benchmark methodology lock-in and eval framework 2026-05-15 22:36:53 -07:00
SESSION-2026-05-21-articulation-arc.md docs(sessions): extend articulation-arc note for Phase 5 2026-05-21 11:03:01 -07:00
SESSION-2026-05-22-contract-layer-arc.md docs: runtime_contracts + eval_methodology + papers + session log (audit #3) (#122) 2026-05-22 13:28:03 -07:00
SESSION-2026-05-23-pedagogy-research-and-teaching-loop-pivot.md docs: pedagogy research review + 2 deferred teaching-loop ADRs 2026-05-23 07:01:55 -07:00
SESSION-2026-05-26-corridor-closure.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
SESSION-2026-05-28-risk-reward-learning-architecture.md docs(adr-0175): calibrated attempt-and-eliminate learning architecture 2026-05-28 14:45:17 -07:00
SESSION-2026-05-29-comprehension-and-overfitting-discipline.md docs: session wrap-up (comprehension chaining + overfitting discipline) + CLAUDE.md substrate (#472) 2026-05-29 11:18:27 -07:00
SESSION-2026-05-29-multistep-build-arc.md docs: session wrap-up (comprehension chaining + overfitting discipline) + CLAUDE.md substrate (#472) 2026-05-29 11:18:27 -07:00
SESSION-2026-06-04-deductive-pivot-and-universal-structure.md docs: session record (2026-06-04) + mark runway PR-1/PR-2 shipped 2026-06-04 16:54:03 -07:00