core/docs
Shay a4a24de836 docs(workbench): add wave-1 brief pack for Phase 1 polish
Four parallel-safe briefs covering Chat/Proposals/Replay/Evals polish,
each with operator assignment, dispatch line, doctrine refs, owned-files
scope, acceptance criteria, and validation commands.

Operator assignment:
- 1a Chat polish     -> Opus 4.6 (surface contract sensitive)
- 1b Proposals polish-> Sonnet 4.6 (tight-scope lifecycle)
- 1c Replay polish   -> Gemini 3.1 Pro (cross-file presentation)
- 1d Evals polish    -> GPT-OSS-120B / Copilot (mechanical)

All four are dispatchable simultaneously. No order dependency.
2026-05-28 07:58:44 -07:00
..
adr
architecture
audit
briefs
curriculum
decisions docs(brief-C): comprehension reader audit — zero eval delta diagnosis + next steps 2026-05-27 20:45:31 -07:00
evals
handoff docs(workbench): add wave-1 brief pack for Phase 1 polish 2026-05-28 07:58:44 -07:00
handoffs docs(handoff): Brief 11 — Phase 2 reader closure + capability snapshot sequencing (#342) 2026-05-27 05:03:40 -07:00
implementation
plans docs(workbench): add CORE-doctrine addendum to UI continuation plan 2026-05-28 07:46:15 -07:00
research docs(epistemic): align audit terminology with runtime enum 2026-05-28 04:17:19 -07:00
sessions docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
workbench feat(W-028): chat surface + trace drawer (#303) 2026-05-26 13:22:11 -07:00
admissibility-exemplars.md feat(ADR-0163.B.2): four new exemplar corpora — discrete_count_statement, multiplicative_aggregation, currency_amount, plus temporal_aggregation v2 widening (#306) 2026-05-26 14:36:59 -07:00
capability_roadmap.md
ethics_packs.md
EVAL_AUDIT_2026-05-20.md
eval_methodology.md
formation_pipeline_plan.md
frontier_baselines.md
gaps.md
hitl-backpressure.md feat(ADR-0161.3): submission-time invariants — duplicate + dependent_on_pending auto-reject (#313) 2026-05-26 16:46:25 -07:00
holdout_recipients.txt
identity_packs.md
master-plan-post-substrate-audit.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
pack_inventory_2026-05-21.md
position_paper.md Update position_paper.md 2026-05-27 18:27:18 -07:00
PROGRESS.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
recognizer-registry.md feat(ADR-0163.D): wire ratified RecognizerSpecs into math_candidate_graph admissibility surface (#302) 2026-05-26 13:11:47 -07:00
refusal-taxonomy.md feat(ADR-0163.A): refusal taxonomy lane — shape categorization of GSM8K admissibility gaps (#297) 2026-05-26 11:27:11 -07:00
reviewers.yaml
runtime_contracts.md
RUST.md
safety_packs.md
teaching_order.md
test-debt-quarantine.md
truth_seeking_schema.md
Whitepaper.md
Yellowpaper.md