core/docs
Shay a32ffdc525
docs(ADR-0131.5): retire GSM8K probe as per-iteration gate after G.x completion (#199)
All five G.x capability axes shipped (G.1–G.5); admission remained 0/50
throughout — expected, because the 50 sample cases fail at the statement
layer (rate verbs, implicit entities, multi-step ops), orthogonal to the
question-layer and initial-state-verb work the G.x axes targeted.

Decisions:
- Probe retired as a per-iteration gate (signal-to-noise ≈ 0 at 0/50)
- `admitted_wrong == 0` invariant preserved as a standing architectural
  invariant, CI-pinned by existing test + per-axis regression guards
- Re-activation criterion named: statement-layer expansion that
  plausibly admits ≥1 new case (Δadmission_rate ≥ 0.02)
- Probe runner + report stay in-repo for future statement-layer push

Docs-only. No test, parser, solver, or eval changes.
2026-05-23 19:49:45 -07:00
..
adr
architecture
curriculum
decisions docs(ADR-0131.5): retire GSM8K probe as per-iteration gate after G.x completion (#199) 2026-05-23 19:49:45 -07:00
evals
handoff
implementation docs: propose semantic-symbolic binding graph layer (#170) 2026-05-23 09:58:39 -07:00
sessions docs: pedagogy research review + 2 deferred teaching-loop ADRs 2026-05-23 07:01:55 -07:00
capability_roadmap.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
ethics_packs.md
EVAL_AUDIT_2026-05-20.md
eval_methodology.md
formation_pipeline_plan.md
frontier_baselines.md
gaps.md
holdout_recipients.txt
identity_packs.md
pack_inventory_2026-05-21.md
PROGRESS.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
reviewers.yaml feat(ADR-0120 math, ledger flip): mathematics_logic → expert tier (first-ever) (#195) 2026-05-23 18:55:34 -07:00
runtime_contracts.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
RUST.md
safety_packs.md
teaching_order.md
truth_seeking_schema.md
Whitepaper.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
Yellowpaper.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00