core/docs/assessment
Shay 8f2e238dc7 docs(assessment): Phase 1 — layer taxonomy and card schema (the keystone)
Fixes the decomposition Phases 2-3 fill and Phase 4 audits against, per
Pillar I: criteria before judgment. Five decisions recorded explicitly:

- D1 The five unreconciled articulations answer five DIFFERENT questions
  (what for / what happens today / by what mechanism / judged how / built
  where) and become axes of one taxonomy rather than competitors. Functional
  axis = the AGENTS.md north star; structural axis = 7 macro layers (M0
  Substrate, M1 Knowledge & Memory, M2 Afferent, M3 Comprehension &
  Reasoning, M4 Expression & Serving, M5 Learning & Growth, M6 Continuity &
  Process) + 2 cross-cuts (MG Governance, MV Verification), grouping all 33
  system-map zones with straddles recorded honestly. Mind-physics blueprint
  dispositioned element-by-element (identity/compositional/renderer =
  superseded by stronger implementations; Allocation Physics and
  DriveGradientMap = orphans -> Candidate Register).
- D2 System-map schema EXTENDED, not replaced: 7-value liveness kept;
  four missing dimensions added as orthogonal fields — evidence (with
  would-fail-if-absent sabotage bit), capacity (designed/measured/ceilings),
  design-vs-build split, fitness (6-value: fit/strained/misplaced/
  wrong-solution/superseded-in-place/undetermined). Liveness ⊥ fitness:
  the 34 organs are live-serving + superseded-in-place, a state no merged
  enum could express.
- D3 Completeness criteria fixed: coverage = evidence-bearing ownership of
  a functional stage; deferred-with-ruling ≠ missing; pins must run.
- D4 Candidate Register: CR-1 attention/allocation (the ~73%-of-turn-time
  hot path has no owner), CR-2 agenda/drive (mechanisms without a chooser;
  L10 risks landing as a heartbeat with nothing to want), CR-3 efferent
  action (needs an explicit deferred-vs-out-of-telos ruling), CR-4 temporal
  self-location (determinism vs lived time, undesigned). Considered-and-not-
  registered recorded (sociality, affect, embodiment, self-governance-as-
  layer) so the boundary is visibly examined.
- D5 Assessment output is COMMITTED (reviewable, versioned, visible);
  system map stays local as a regeneratable navigation index. Staleness
  handled by verified_at SHA stamps on every card.

Phase 2 work order: nine layer cards, priority M6 > M3 > M4 > M5; re-verify
every map liveness label; run the stage-coverage audit with evidence; the
four zero-subsystem zones scoped honestly and queued first for Phase 3.
2026-07-27 15:28:42 -07:00
..
00-scope-and-method.md docs(assessment): Phase 0 — ground truth, corpus triage, and the Phase 1 handoff 2026-07-27 15:19:54 -07:00
01-phase0-ground-truth.md docs(assessment): Phase 0 — ground truth, corpus triage, and the Phase 1 handoff 2026-07-27 15:19:54 -07:00
02-layer-taxonomy.md docs(assessment): Phase 1 — layer taxonomy and card schema (the keystone) 2026-07-27 15:28:42 -07:00
03-card-schema.md docs(assessment): Phase 1 — layer taxonomy and card schema (the keystone) 2026-07-27 15:28:42 -07:00