Session journey: the deductive pivot (verified, not asserted), INV-25 independent- gold ratification, the universal-structure + field<->symbol coherence-gate synthesis, and the autonomous build of the foundation + 3-domain anti-overfit panel (#554-557). Records the two field-as-reasoner findings (logic is combinatorial; independence must live in the reading) that defer the geometric wedge to dedicated research. Marks the deductive-logic runway's PR-1 (finite-entity grounding) and PR-2 (oracle parity) as shipped via #556. |
||
|---|---|---|
| .. | ||
| composition-capability-scope.md | ||
| composition-wall-execution-plan-2026-06-03.md | ||
| comprehension-primitive-inventory.md | ||
| deductive-logic-phase-2-benchmark-runway-2026-06-04.md | ||
| extraction-richness-audit-2026-06-03.md | ||
| gsm8k-lift-program-strategy-2026-06-04.md | ||
| pivot-to-deductive-logic-2026-06-04.md | ||
| question-layer-gap-survey.md | ||
| real-gsm8k-capability-measurement-2026-06-04.md | ||
| solver-operation-coverage.md | ||
| universal-structure-and-field-symbol-coherence-gate-2026-06-04.md | ||
| wiring-promotion-gate-brief-2026-06-03.md | ||