core/docs
Shay ffa04f775b
docs(consumption-wiring): operator dispatch pack (CW-1 + CW-2) (#397)
Production-line dispatch form of the consumption-wiring brief in
PR #396. One bundled PR recommended (CW-1 + CW-2 share pack-compile
+ manifest extension + case 0050 pin). Split only if CI cycle time
forces.

CW-1 — Frame consumption:
  language_packs/compile_frames.py + generate/comprehension/frame_registry.py
  + reader wire + manifest frame_checksum extension.

CW-2 — Composition consumption:
  language_packs/compile_compositions.py +
  generate/comprehension/composition_registry.py + injector wire in
  generate/recognizer_anchor_inject.py + manifest
  composition_checksum extension. SAFE_COMPOSITION_CATEGORIES
  enforced at load (defense in depth); polarity "falsifies"
  suppresses injection (not silently "affirms").

Truth test pinned as binding (6-row table). PR is not done unless
case 0019 admits, case 0050 stays refused, train_sample moves from
3/47 → ≥4/46, wrong==0 holds, public split unchanged (150/150),
empty-registry runtime byte-identical to today.

Operator profile: Opus (load-bearing wrong=0 surface; case 0050
mandatory pin; same rigor as CC-2).
2026-05-27 16:16:41 -07:00
..
adr
architecture
audit fix(phase2): close W-006/W-010/W-013/W-014/W-019 operator decisions (#270) 2026-05-25 11:34:19 -07:00
briefs feat(W-019): learning-arc demo — engine-authored proposal from contemplation (ADR-0152) (#276) 2026-05-25 13:03:10 -07:00
curriculum
decisions docs(ADR-0173): Workbench Ratification Trust Boundary (W0) (#394) 2026-05-27 15:34:43 -07:00
evals
handoff docs(consumption-wiring): operator dispatch pack (CW-1 + CW-2) (#397) 2026-05-27 16:16:41 -07:00
handoffs docs(handoff): Brief 11 — Phase 2 reader closure + capability snapshot sequencing (#342) 2026-05-27 05:03:40 -07:00
implementation docs: propose semantic-symbolic binding graph layer (#170) 2026-05-23 09:58:39 -07:00
plans docs(plan): add CORE general advancement path (#314) 2026-05-26 18:32:08 -07:00
sessions docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
workbench feat(W-028): chat surface + trace drawer (#303) 2026-05-26 13:22:11 -07:00
admissibility-exemplars.md feat(ADR-0163.B.2): four new exemplar corpora — discrete_count_statement, multiplicative_aggregation, currency_amount, plus temporal_aggregation v2 widening (#306) 2026-05-26 14:36:59 -07:00
capability_roadmap.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
ethics_packs.md
EVAL_AUDIT_2026-05-20.md
eval_methodology.md
formation_pipeline_plan.md
frontier_baselines.md
gaps.md
hitl-backpressure.md feat(ADR-0161.3): submission-time invariants — duplicate + dependent_on_pending auto-reject (#313) 2026-05-26 16:46:25 -07:00
holdout_recipients.txt feat: ADR-0119.1 — seal fabrication_control holdout with age encryption (Obligation #1) 2026-05-22 17:22:46 -07:00
identity_packs.md
master-plan-post-substrate-audit.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
pack_inventory_2026-05-21.md
PROGRESS.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
recognizer-registry.md feat(ADR-0163.D): wire ratified RecognizerSpecs into math_candidate_graph admissibility surface (#302) 2026-05-26 13:11:47 -07:00
refusal-taxonomy.md feat(ADR-0163.A): refusal taxonomy lane — shape categorization of GSM8K admissibility gaps (#297) 2026-05-26 11:27:11 -07:00
reviewers.yaml fix(quarantine): drain all 60 quarantined tests — QUARANTINE=∅ (#267) 2026-05-25 11:22:12 -07:00
runtime_contracts.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
RUST.md
safety_packs.md
teaching_order.md
test-debt-quarantine.md ci: full-pytest gate + QUARANTINE registry (49 known failures, uv) (#263) 2026-05-25 06:21:04 -07:00
truth_seeking_schema.md
Whitepaper.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
Yellowpaper.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00