core/docs
Shay 73e52a128b
docs(tier1.5+tier2): FrameClaim handler + Tier 2 W5 schema brief pack (#387)
* docs(tier1.5+tier2): FrameClaim handler + Tier 2 W5 schema brief pack

Two parallel briefs ready for dispatch:
- F1: FrameClaim ratification handler (Opus) — implements ADR-0168 +
  ADR-0168.1; turns 2 of 8 Tier 1 proposals into real GSM8K
  admissions on ratify
- T2-W5: MathReaderInferenceProposal schema (Sonnet) — Tier 2 substrate
  with two-arm test-and-learn type contract

Zero file overlap between briefs; safe to dispatch concurrently. W6+
deferred until FrameClaim is live (Arm 2 known-good preservation needs
a working handler to verify against).

* docs(briefs): correct pack + workbench paths in Tier 1.5/Tier 2 brief

Operator dispatching F1 (PR #389) discovered:
- Pack path is language_packs/data/en_core_math_v1/, not packs/en_core_math_v1/
- Workbench dispatch table lives in workbench/readers.py, not workbench/api.py

Both operators landed on the correct locations regardless. Folding the
corrections into #387 directly so future operators reading the brief
get the real paths.
2026-05-27 14:05:53 -07:00
..
adr
architecture
audit fix(phase2): close W-006/W-010/W-013/W-014/W-019 operator decisions (#270) 2026-05-25 11:34:19 -07:00
briefs feat(W-019): learning-arc demo — engine-authored proposal from contemplation (ADR-0152) (#276) 2026-05-25 13:03:10 -07:00
curriculum
decisions docs(ADR-0172): math-domain corpus-decomposition mechanism (Learning Arc analog) (#376) 2026-05-27 11:43:53 -07:00
evals
handoff docs(tier1.5+tier2): FrameClaim handler + Tier 2 W5 schema brief pack (#387) 2026-05-27 14:05:53 -07:00
handoffs docs(handoff): Brief 11 — Phase 2 reader closure + capability snapshot sequencing (#342) 2026-05-27 05:03:40 -07:00
implementation docs: propose semantic-symbolic binding graph layer (#170) 2026-05-23 09:58:39 -07:00
plans docs(plan): add CORE general advancement path (#314) 2026-05-26 18:32:08 -07:00
sessions docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
workbench feat(W-028): chat surface + trace drawer (#303) 2026-05-26 13:22:11 -07:00
admissibility-exemplars.md feat(ADR-0163.B.2): four new exemplar corpora — discrete_count_statement, multiplicative_aggregation, currency_amount, plus temporal_aggregation v2 widening (#306) 2026-05-26 14:36:59 -07:00
capability_roadmap.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
ethics_packs.md
EVAL_AUDIT_2026-05-20.md
eval_methodology.md feat: ADR-0113 rename expert-demoaudit-passed; reserve expert namespace (ADR-0114 GSM8K roadmap) 2026-05-22 15:36:10 -07:00
formation_pipeline_plan.md
frontier_baselines.md
gaps.md
hitl-backpressure.md feat(ADR-0161.3): submission-time invariants — duplicate + dependent_on_pending auto-reject (#313) 2026-05-26 16:46:25 -07:00
holdout_recipients.txt feat: ADR-0119.1 — seal fabrication_control holdout with age encryption (Obligation #1) 2026-05-22 17:22:46 -07:00
identity_packs.md
master-plan-post-substrate-audit.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
pack_inventory_2026-05-21.md
PROGRESS.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
recognizer-registry.md feat(ADR-0163.D): wire ratified RecognizerSpecs into math_candidate_graph admissibility surface (#302) 2026-05-26 13:11:47 -07:00
refusal-taxonomy.md feat(ADR-0163.A): refusal taxonomy lane — shape categorization of GSM8K admissibility gaps (#297) 2026-05-26 11:27:11 -07:00
reviewers.yaml fix(quarantine): drain all 60 quarantined tests — QUARANTINE=∅ (#267) 2026-05-25 11:22:12 -07:00
runtime_contracts.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
RUST.md
safety_packs.md
teaching_order.md
test-debt-quarantine.md ci: full-pytest gate + QUARANTINE registry (49 known failures, uv) (#263) 2026-05-25 06:21:04 -07:00
truth_seeking_schema.md
Whitepaper.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00
Yellowpaper.md docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10) 2026-05-22 20:39:24 -07:00