Load-bearing strategic record: what the GSM8K chase got wrong (overfit 50-case ruler hiding a sealed wrong=0 breach), the held-out measurement that exposed real capability=0% / composer 17% wrong, why GSM8K is the wrong terrain for a deterministic verifiable engine, and the deductive- logic path now (Phase 1 done: 500/500 held-out wrong=0, independent- oracle verified) with phases 2-4 and the anti-recurrence disciplines. |
||
|---|---|---|
| .. | ||
| composition-capability-scope.md | ||
| composition-wall-execution-plan-2026-06-03.md | ||
| comprehension-primitive-inventory.md | ||
| extraction-richness-audit-2026-06-03.md | ||
| gsm8k-lift-program-strategy-2026-06-04.md | ||
| pivot-to-deductive-logic-2026-06-04.md | ||
| question-layer-gap-survey.md | ||
| real-gsm8k-capability-measurement-2026-06-04.md | ||
| solver-operation-coverage.md | ||
| wiring-promotion-gate-brief-2026-06-03.md | ||