ADR-0111 landed via PR #123 (merge commit 4b5e6b7). The structural docs
(README, ADR index, reviewers.yaml, CLAIMS.md) were updated in that PR.
The narrative docs that reference the worked-promotion arc by ordinal
("first promotion / one demonstrated domain") needed a follow-up sweep:
- docs/PROGRESS.md — ADR-0100 footnote, ADR-0111 row, ledger table,
Open-within-Phase-6 changed from "second" to "third" promotion
- docs/runtime_contracts.md — narrative line on contract demonstration
- docs/Whitepaper.md §XIII — chain range, demonstration paragraph,
"two domains demonstrated" line, full-chain pointer
- docs/capability_roadmap.md — Phase 6 worked-promotion narrative step 5
and exit-criteria checklist (5th item now ☑, 6th open as "third")
docs/Yellowpaper.md is unchanged: its expert-demo section is the formal
contract spec, domain-agnostic. docs/eval_methodology.md unchanged for
the same reason. docs/sessions/SESSION-2026-05-22-contract-layer-arc.md
is left as the historical snapshot of the original session.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>