The docs/proposal-artifact-substrate-v1 work (#727) — wave-m-consolidation-b3.5,
core-logos-studio-plan, proposal-artifact-substrate-v1 — is the authoritative
consolidation and supersedes the parallel 'Phase A' I'd just drafted. Reconciling
to one source of truth:
- FOLD IN the one genuine gap b3.5 missed (a design review caught it): the
Calibration centerpiece undersells — the reader reads the sub-N_MIN committed
practice report.json, so on live data no class shows licensed, while the
earned state (additive 95/5/100, PROPOSE-licensed) sits in the disagreeing
ratification_queue.json. Added as a diagnosis addendum + a Deliverable-2
acceptance criterion (make the committed practice artifacts coherent; show
≥1 earned class). Data-side fix, not a re-derivation.
- FOLD IN the grouped-navigation idea: a field on the route registry
(Deliverable 1) + the organism's-loop grouping (Converse/Cognition/Evidence/
Determinism/Discipline/Substrate/Settings), with the correction that
'core-logos' is the language/manifold Studio surface, not the cognition cluster.
- REDIRECT wave-M-worthiness.md's consolidation section to point at b3.5 instead
of defining a parallel Phase A.
- SCRAP duplicates: wave-M-phaseA-briefs (duplicated b3.5) and
workbench-ui-ux-guide-brief (superseded by b3.5 Deliverable 4).