..
adr
feat(runtime): opt-in unified-ingest path (ADR-0090, audit Findings 6+7) ( #95 )
2026-05-20 21:00:27 -07:00
architecture
audit
fix(phase2): close W-006/W-010/W-013/W-014/W-019 operator decisions ( #270 )
2026-05-25 11:34:19 -07:00
briefs
feat(W-019): learning-arc demo — engine-authored proposal from contemplation (ADR-0152) ( #276 )
2026-05-25 13:03:10 -07:00
curriculum
decisions
docs(adr-0174): amend Phase 5 scope — invert premise, split 5a/5b
2026-05-28 13:19:30 -07:00
evals
handoff
feat(adr-0174-phase3a): lookback re-evaluation operator + pronoun resolution substrate
2026-05-28 10:49:20 -07:00
handoffs
docs(handoff): Brief 11 — Phase 2 reader closure + capability snapshot sequencing ( #342 )
2026-05-27 05:03:40 -07:00
implementation
docs: propose semantic-symbolic binding graph layer ( #170 )
2026-05-23 09:58:39 -07:00
plans
docs(plan): add CORE general advancement path ( #314 )
2026-05-26 18:32:08 -07:00
research
docs(epistemic): align audit terminology with runtime enum
2026-05-28 04:17:19 -07:00
sessions
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational ( #305 )
2026-05-26 13:49:08 -07:00
workbench
feat(W-028): chat surface + trace drawer ( #303 )
2026-05-26 13:22:11 -07:00
admissibility-exemplars.md
feat(ADR-0163.B.2): four new exemplar corpora — discrete_count_statement, multiplicative_aggregation, currency_amount, plus temporal_aggregation v2 widening ( #306 )
2026-05-26 14:36:59 -07:00
capability_roadmap.md
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
2026-05-22 20:39:24 -07:00
ethics_packs.md
EVAL_AUDIT_2026-05-20.md
eval_methodology.md
feat: ADR-0113 rename expert-demo → audit-passed; reserve expert namespace (ADR-0114 GSM8K roadmap)
2026-05-22 15:36:10 -07:00
formation_pipeline_plan.md
frontier_baselines.md
gaps.md
Add chain-first capability ledger and domain seeds ( #97 )
2026-05-20 21:33:24 -07:00
hitl-backpressure.md
feat(ADR-0161.3): submission-time invariants — duplicate + dependent_on_pending auto-reject ( #313 )
2026-05-26 16:46:25 -07:00
holdout_recipients.txt
feat: ADR-0119.1 — seal fabrication_control holdout with age encryption (Obligation #1 )
2026-05-22 17:22:46 -07:00
identity_packs.md
master-plan-post-substrate-audit.md
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational ( #305 )
2026-05-26 13:49:08 -07:00
pack_inventory_2026-05-21.md
docs: pack inventory 2026-05-21 — strengths, weaknesses, leverage gaps ( #84 )
2026-05-20 19:59:18 -07:00
position_paper.md
Update position_paper.md
2026-05-27 18:27:18 -07:00
PROGRESS.md
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational ( #305 )
2026-05-26 13:49:08 -07:00
recognizer-registry.md
feat(ADR-0163.D): wire ratified RecognizerSpecs into math_candidate_graph admissibility surface ( #302 )
2026-05-26 13:11:47 -07:00
refusal-taxonomy.md
feat(ADR-0163.A): refusal taxonomy lane — shape categorization of GSM8K admissibility gaps ( #297 )
2026-05-26 11:27:11 -07:00
reviewers.yaml
fix(quarantine): drain all 60 quarantined tests — QUARANTINE=∅ ( #267 )
2026-05-25 11:22:12 -07:00
runtime_contracts.md
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
2026-05-22 20:39:24 -07:00
RUST.md
safety_packs.md
teaching_order.md
test-debt-quarantine.md
ci: full-pytest gate + QUARANTINE registry (49 known failures, uv) ( #263 )
2026-05-25 06:21:04 -07:00
truth_seeking_schema.md
Whitepaper.md
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
2026-05-22 20:39:24 -07:00
Yellowpaper.md
docs: Phase 5 GSM8K-math substrate completion sweep (ADR-0119 + sub-phases + ADR-0114a 10/10)
2026-05-22 20:39:24 -07:00