Execution-ready brief for the next comprehension increment (user-chosen, doctrine-aligned): read arithmetic word-problem prose into the binding_graph quantity substrate -> project to the independent relational_metric oracle -> wrong=0. Reuses the existing 15-case relational_metric gold lane (no gold authoring). Captures the full scope from this session: the oracle grammar (fact/more_than/ fewer_than/sum_of), the new number-parsing reader capability, binding_graph construction (SymbolBinding/BoundFact/BoundEquation with REAL admissibility — a proof obligation, not a stamp), the direct-construction recommendation (keep the comprehension organ disjoint from the GSM8K MathProblemGraph / serving path), the projector, wiring, the generative round-trip anti-overfit test, and the validation gates. Briefed rather than rushed: this is binding_graph's first comprehension consumer, a load-bearing integration whose correctness hinges on real equation admissibility — it deserves fresh context, per "no shortcuts on architectural gaps". |
||
|---|---|---|
| .. | ||
| phase-3b-4-skeleton | ||
| ADR-0084-pack-content-brief.md | ||
| ADR-0085-content-style-pass-brief.md | ||
| ADR-0085-content-style-pass-v2-brief.md | ||
| ADR-0167-FOLLOWUPS.md | ||
| ADR-0167-PARALLEL-WORK-PLAN.md | ||
| ADR-0167-W2C-cross-domain-audit.md | ||
| ADR-0172-TIER1-BRIEF-PACK.md | ||
| ADR-0174-PHASE-3B-4-COMBINED-SCOPE.md | ||
| arithmetic-comprehension-via-binding-graph-2026-06-05.md | ||
| AUDIT-ADR-0178-GB1-GB2.md | ||
| AUDIT-ADR-0179-EX-RECONCILE.md | ||
| BACKLOG-everyday-atoms-grounding-pack.md | ||
| BRIEF-11-phase-2-reader-closure-and-capability-snapshot.md | ||
| CHATGPT-REMOTE-BRIEF.md | ||
| CLEANUP-C2-run-lane-migration.md | ||
| CLEANUP-C4-compositions-compile.md | ||
| CODEX-domain-pack-closure-cleanup-brief.md | ||
| CODEX-greek-hebrew-content-phase-ii-brief.md | ||
| COMPOSITION-FRAME-CONSUMPTION-WIRING-BRIEF.md | ||
| COMPOSITIONCLAIM-BRIEF-PACK.md | ||
| COMPREHENSION-READER-AUDIT.md | ||
| CONSUMPTION-WIRING-DISPATCH-PACK.md | ||
| DCS-S1-FINDING.md | ||
| discrete_count_statement-injector-spec.md | ||
| MATCHER-EXTENSION-DISPATCH-PACK.md | ||
| ME1-ME5-MILESTONE.md | ||
| NEXT-SUBJECTS-CHATGPT-HANDOFF.md | ||
| PARALLEL-WORK-PLAN-2026-05-29.md | ||
| PHASE-3.1-FOLLOWUP-RECOGNIZER-EXPANSION.md | ||
| POST-RAT1-PARALLEL-BRIEFS.md | ||
| RB-GSM-SOLVER-DESIGN-INPUT.md | ||
| sealed-measurement-obligation-2026-06-04.md | ||
| SEMANTIC-STATE-TRANSITION-BLUEPRINT.md | ||
| stage-c-composition-investigation-2026-06-03.md | ||
| TIER2-AND-FRAMECLAIM-BRIEF-PACK.md | ||
| VERB-EXPANSION-DISPATCH-PACK.md | ||
| WAVE-NEXT-REVISED.md | ||
| WORKBENCH-UI-WAVE-BRIEF-PACK.md | ||
| WORKBENCH-UI-WAVE-SCOPING.md | ||
| WORKBENCH-W3-RATIFICATION-CORRIDOR-BRIEF.md | ||