core/docs/analysis
Shay 0b191055a8 docs(analysis): comprehension capability ledger — R1/R2 baseline + refusal taxonomy (N1)
Post-merge baseline for the contemplation batch: R1 7/0/3, R2 reader 10/0/0, gold 13/13, serving unchanged. Enumerates the full typed refusal surface across both organs (R1 reader/admissibility, R2 reader/solver/answer-choice) and a first-pass cross-organ failure-family taxonomy with must_remain_refused / proposal_allowed / owner — the table N4 will make executable. Repeats the load-bearing distinction: correct refusal != missing capability.
2026-06-07 08:36:22 -07:00
..
AGI-candidacy-autonomous-improvement-roadmap-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
composition-capability-scope.md
composition-wall-execution-plan-2026-06-03.md
comprehension-capability-ledger-2026-06-07.md docs(analysis): comprehension capability ledger — R1/R2 baseline + refusal taxonomy (N1) 2026-06-07 08:36:22 -07:00
comprehension-primitive-inventory.md
D-close-consolidation-design-2026-06-06.md feat(determine): idle deductive consolidation — the loop learns from determined facts (Step D) 2026-06-06 12:28:09 -07:00
deductive-logic-phase-2-benchmark-runway-2026-06-04.md docs: session record (2026-06-04) + mark runway PR-1/PR-2 shipped 2026-06-04 16:54:03 -07:00
E-estimation-design-2026-06-06.md feat(determine): calibrated disclosed estimation — the engine earns the right to guess (Step E) 2026-06-06 13:49:07 -07:00
extraction-richness-audit-2026-06-03.md
field-reasoner-wedge-design-and-falsification-2026-06-04.md docs: field-reasoner wedge design + falsification dossier 2026-06-04 19:22:16 -07:00
field-wedge-ablation-result-2026-06-04.md feat(field-wedge): ablation verdict — field is decoration on additive (C3) (Phase W.2) 2026-06-04 19:44:22 -07:00
gsm8k-lift-program-strategy-2026-06-04.md
L10-continuity-spike-design-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
L10-runtime-scoping-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
L10-shapeBplus-persistence-scope-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
math-serving-seam-design-2026-06-06.md feat(derivation): math-serving reach seam — select_self_verified is policy-aware (ADR-0206 §5) 2026-06-06 15:46:14 -07:00
oov-grounding-determinism-morphology-affinity-collapse.md fix: derive oov grounding from token content 2026-06-06 05:46:01 -07:00
phase2-general-comprehension-organ-scope-2026-06-05.md docs(analysis): Phase 2 spike — syntax pack is not a parser; structural-decode fork 2026-06-05 15:41:36 -07:00
pivot-to-deductive-logic-2026-06-04.md feat: ratify independent-gold invariant (INV-25) + SHA-pin deductive lane 2026-06-04 15:56:28 -07:00
question-layer-gap-survey.md
r1-inventory-ledger-2026-06-07.md feat(comprehension): inverse reader frame — base of a more/fewer-than (PR-7b / R2 C0) 2026-06-07 07:06:26 -07:00
r2-inventory-ledger-2026-06-07.md docs(analysis): R2 inventory ledger — reader 10/0/0, 6 families read+solved+verified (R2 C9) 2026-06-07 07:36:17 -07:00
real-gsm8k-capability-measurement-2026-06-04.md docs: fourth lift attempt falsified (strict sum-reader 0/2) — exhaustive 2026-06-04 02:52:24 -07:00
REALIZE-R1-DETERMINE-scope-2026-06-06.md fix(realize): lookback hardening — defensive admissibility re-assertion + coverage 2026-06-06 06:31:54 -07:00
REALIZE-scope-2026-06-06.md docs(analysis): REALIZE phase scope (Step 3) — verified against the real substrate 2026-06-06 01:48:19 -07:00
relational-grounding-extension-2026-06-04.md feat(deductive): binary relations + multi-variable grounding (finite propositional) 2026-06-04 20:17:33 -07:00
solver-operation-coverage.md
universal-structure-and-field-symbol-coherence-gate-2026-06-04.md feat: Phase 2 — finite-entity grounding compiler + Phase 1.5 finding 2026-06-04 16:32:03 -07:00
VERIFIED-canonical-comparison-scoping-2026-06-06.md docs(analysis): VERIFIED producer — validate-first verdict is DO NOT BUILD (comprehension-bound) 2026-06-06 16:09:41 -07:00
wiring-promotion-gate-brief-2026-06-03.md