The 1.28% is now an instrument instead of testimony. evals/perception/read_rate.py measures the logic reader over holdout_dev/v1 deterministically (23/1,798 sentences, refusal taxonomy included, 0.57s); tests/test_read_rate_floor.py pins it in both directions — a comprehension regression fails the gate, and an improvement must move the recorded constants in the same reviewed commit, so capability motion is a decision with a diff, never an accident with a story. Non-vacuity guarded (the matcher must still say no; counts must conserve). Two sabotages observed red. Registered in smoke (~0.8s). This is one of exactly two old-plan items that survive the keel triage (the other is FA-1): it is the baseline number the keel's K4 perception layer is accountable for moving in chunks. PR-8, PR-10, Track B widening and Track C are superseded by keel phases K6/K6/K4/K5 and are not being finished here — finishing them would be polishing the quarry. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01Wcw2pnMBwyvmNyQg4uPEt4
1 line
100 B
Python
1 line
100 B
Python
"""Perception measurement lane — the read-rate instrument (Perception Arc Phase 0, G-21/G-24)."""
|