| .. |
|
AGI-candidacy-autonomous-improvement-roadmap-2026-06-05.md
|
|
|
|
ask-serving-integration-scoping-2026-06-08.md
|
docs(epistemic): scope ASK and VERIFIED serving gates
|
2026-06-08 22:22:35 -07:00 |
|
ask-serving-integration-scoping-2026-06-09.md
|
docs(epistemic): tighten pass_manager scoping wording and use relative links
|
2026-06-09 09:26:49 -07:00 |
|
cmb-a-combined-rate-ruler-2026-06-08.md
|
feat(combined-rate): CMB-a — combined-rate setup ruler (model + gold + oracle)
|
2026-06-08 06:58:17 -07:00 |
|
cmb-lookback-review-2026-06-08.md
|
docs(cmb): lookback review + fix single-agent-attribution hygiene hazard (H3)
|
2026-06-08 13:27:17 -07:00 |
|
combined-rate-capability-ledger-2026-06-08.md
|
docs(comprehension): freeze combined-rate (R4) v1 — capability ledger + non-claims (CMB-e)
|
2026-06-08 14:13:39 -07:00 |
|
composition-capability-scope.md
|
|
|
|
composition-wall-execution-plan-2026-06-03.md
|
|
|
|
comprehension-capability-ledger-2026-06-07.md
|
docs(comprehension): whole-system organ capability ledger + fix ADR-0211 number collision
|
2026-06-08 06:15:51 -07:00 |
|
comprehension-organ-capability-ledger-2026-06-08.md
|
docs(comprehension): freeze combined-rate (R4) v1 — capability ledger + non-claims (CMB-e)
|
2026-06-08 14:13:39 -07:00 |
|
comprehension-primitive-inventory.md
|
|
|
|
D-close-consolidation-design-2026-06-06.md
|
|
|
|
deductive-logic-phase-2-benchmark-runway-2026-06-04.md
|
|
|
|
E-estimation-design-2026-06-06.md
|
|
|
|
extraction-richness-audit-2026-06-03.md
|
|
|
|
field-reasoner-wedge-design-and-falsification-2026-06-04.md
|
|
|
|
field-wedge-ablation-result-2026-06-04.md
|
|
|
|
gsm8k-lift-program-strategy-2026-06-04.md
|
|
|
|
L10-continuity-spike-design-2026-06-05.md
|
|
|
|
L10-runtime-scoping-2026-06-05.md
|
|
|
|
L10-shapeBplus-persistence-scope-2026-06-05.md
|
|
|
|
math-serving-seam-design-2026-06-06.md
|
|
|
|
oov-grounding-determinism-morphology-affinity-collapse.md
|
|
|
|
phase2-general-comprehension-organ-scope-2026-06-05.md
|
|
|
|
pivot-to-deductive-logic-2026-06-04.md
|
|
|
|
proposal-review-idle-integration-2026-06-08.md
|
docs(proposal-review): idle-integration boundary ledger (IT-c)
|
2026-06-07 22:33:17 -07:00 |
|
proposal-review-reporter-2026-06-07.md
|
docs(proposal-review): boundary ledger — read-only reporter, not idle_tick, not L10 (RPT-d)
|
2026-06-07 21:44:07 -07:00 |
|
q1-d-ask-bus-delivery-scoping-2026-06-08.md
|
docs(epistemic): record accepted Q1-D delivery decisions
|
2026-06-09 09:16:24 -07:00 |
|
q1-epistemic-question-articulation-v1-scoping-2026-06-08.md
|
docs(scoping): epistemic disclosure bus (Stage 2 / VERIFIED v1) + Q1 question-articulation briefs
|
2026-06-08 14:53:47 -07:00 |
|
question-layer-gap-survey.md
|
|
|
|
r1-inventory-ledger-2026-06-07.md
|
feat(comprehension): inverse reader frame — base of a more/fewer-than (PR-7b / R2 C0)
|
2026-06-07 07:06:26 -07:00 |
|
r2-inventory-ledger-2026-06-07.md
|
docs(comprehension): whole-system organ capability ledger + fix ADR-0211 number collision
|
2026-06-08 06:15:51 -07:00 |
|
r3-1-router-integration-2026-06-08.md
|
feat(contemplation): wire R3 into the multi-organ router + pass manager (R3.1)
|
2026-06-08 02:05:34 -07:00 |
|
r3-2-unit-conversion-2026-06-08.md
|
feat(rate): exact time-unit conversion for single-rate (R3.2b-e)
|
2026-06-08 05:43:51 -07:00 |
|
r3-rate-inventory-ledger-2026-06-08.md
|
feat(rate): R3 inventory ledger + failure-family wiring (R3e)
|
2026-06-07 23:12:23 -07:00 |
|
real-gsm8k-capability-measurement-2026-06-04.md
|
|
|
|
REALIZE-R1-DETERMINE-scope-2026-06-06.md
|
|
|
|
REALIZE-scope-2026-06-06.md
|
|
|
|
relational-grounding-extension-2026-06-04.md
|
|
|
|
router-organ-hygiene-invariant-2026-06-08.md
|
test(contemplation): standing router-organ-hygiene invariant
|
2026-06-08 05:28:06 -07:00 |
|
solver-operation-coverage.md
|
|
|
|
stage2-epistemic-disclosure-bus-verified-v1-scoping-2026-06-08.md
|
docs(scoping): lock VERIFIED as a distinct disclosure mode, not APPROXIMATE (review fix)
|
2026-06-08 15:00:38 -07:00 |
|
universal-structure-and-field-symbol-coherence-gate-2026-06-04.md
|
|
|
|
VERIFIED-canonical-comparison-scoping-2026-06-06.md
|
docs(analysis): VERIFIED producer — validate-first verdict is DO NOT BUILD (comprehension-bound)
|
2026-06-06 16:09:41 -07:00 |
|
verified-serving-wiring-scoping-2026-06-08.md
|
docs(epistemic): scope ASK and VERIFIED serving gates
|
2026-06-08 22:22:35 -07:00 |
|
verified-serving-wiring-scoping-2026-06-09.md
|
docs(verified): scope serving-time verification gate
|
2026-06-09 09:41:34 -07:00 |
|
wiring-promotion-gate-brief-2026-06-03.md
|
|
|