core/docs/sessions
Shay 65ccb8eeee
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305)
Captures today's end-to-end closure of the math architecture corridor
(ADR-0163 Phase A → B → C → D + operator ratification, 15 PRs, first
non-zero GSM8K correct count: 0 → 3 with wrong = 0 preserved) and the
workbench surface (W-026 API + ADR-0162 design system + W-027 shell +
W-028 chat surface) becoming operational end-to-end.

Added:
- docs/sessions/SESSION-2026-05-26-corridor-closure.md — full session
  ledger, per-fork accomplishments, three lifted GSM8K cases,
  unexpected-positive observation about skip-only wiring, deferred
  work, architectural state at close.

Updated:
- docs/master-plan-post-substrate-audit.md — 2026-05-26 amendment
  banner pointing to the session recap; historical 2026-05-24 plan
  preserved below.
- docs/PROGRESS.md — appended a new section capturing the day's 15
  PRs by fork (math, workbench, HITL), the first-lift counts, and
  what stays open.
- docs/decisions/ADR-0163-gsm8k-path-to-mastery.md — Round 1
  amendment with the actual lift evidence, the three lifted cases,
  the capability-axis preservation, and the unexpected-positive note
  about skip-only wiring doing more than projected.

Scope: docs-only.  No runtime, no tests, no code changes.
2026-05-26 13:49:08 -07:00
..
SESSION-2026-05-13.md
SESSION-2026-05-15-capability-gates.md
SESSION-2026-05-21-articulation-arc.md docs(sessions): extend articulation-arc note for Phase 5 2026-05-21 11:03:01 -07:00
SESSION-2026-05-22-contract-layer-arc.md docs: runtime_contracts + eval_methodology + papers + session log (audit #3) (#122) 2026-05-22 13:28:03 -07:00
SESSION-2026-05-23-pedagogy-research-and-teaching-loop-pivot.md docs: pedagogy research review + 2 deferred teaching-loop ADRs 2026-05-23 07:01:55 -07:00
SESSION-2026-05-26-corridor-closure.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00