core/docs
Shay 85b8f0cd11 docs(post-rat1): four parallel dispatch briefs (B/C/D/E)
After RAT-1's architecture audit exposed five systematically
underbuilt components, A (the 4 missing injectors) is being taken by
this agent. The other four are parallel-safe and each gets its own
dispatch brief:

  B (Opus)   — contemplation produces ratifiable claims (medium)
  C (Sonnet) — comprehension reader audit + decision (small→medium)
  D (Sonnet) — core teaching coverage CLI (small)
  E (Codex)  — lexical ratification auto-compile (tiny)

Each brief carries: operator profile, branch name, base, dispatch
line, reads required FIRST, outcome inventory, hard requirements,
tests, truth test. Anti-regression invariants enumerated. All
parallel-safe — no shared file conflicts.

The dispatch DAG names ALL FIVE pieces with A in-flight as a peer.
2026-05-27 20:24:39 -07:00
..
adr
architecture
audit
briefs
curriculum
decisions docs(ADR-0173): Workbench Ratification Trust Boundary (W0) (#394) 2026-05-27 15:34:43 -07:00
evals
handoff docs(post-rat1): four parallel dispatch briefs (B/C/D/E) 2026-05-27 20:24:39 -07:00
handoffs docs(handoff): Brief 11 — Phase 2 reader closure + capability snapshot sequencing (#342) 2026-05-27 05:03:40 -07:00
implementation
plans docs(plan): add CORE general advancement path (#314) 2026-05-26 18:32:08 -07:00
sessions docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
workbench feat(W-028): chat surface + trace drawer (#303) 2026-05-26 13:22:11 -07:00
admissibility-exemplars.md feat(ADR-0163.B.2): four new exemplar corpora — discrete_count_statement, multiplicative_aggregation, currency_amount, plus temporal_aggregation v2 widening (#306) 2026-05-26 14:36:59 -07:00
capability_roadmap.md
ethics_packs.md
EVAL_AUDIT_2026-05-20.md
eval_methodology.md
formation_pipeline_plan.md
frontier_baselines.md
gaps.md
hitl-backpressure.md feat(ADR-0161.3): submission-time invariants — duplicate + dependent_on_pending auto-reject (#313) 2026-05-26 16:46:25 -07:00
holdout_recipients.txt
identity_packs.md
master-plan-post-substrate-audit.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
pack_inventory_2026-05-21.md
position_paper.md Update position_paper.md 2026-05-27 18:27:18 -07:00
PROGRESS.md docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305) 2026-05-26 13:49:08 -07:00
recognizer-registry.md feat(ADR-0163.D): wire ratified RecognizerSpecs into math_candidate_graph admissibility surface (#302) 2026-05-26 13:11:47 -07:00
refusal-taxonomy.md
reviewers.yaml
runtime_contracts.md
RUST.md
safety_packs.md
teaching_order.md
test-debt-quarantine.md
truth_seeking_schema.md
Whitepaper.md
Yellowpaper.md