core/docs/analysis
Shay 261c0e4c2d docs(analysis): R1 comprehension inventory ledger
Baseline decision artifact at main@5ada1392 (post-#616). Records the R1
4/0/6 state per-fixture: the 4 admitted semantic families and the invariant
protecting each, and a classification of the 6 refusals — 2 pure phrasing
gaps (r1-03/r1-04 aggregate-query), 1 real reverse-solve capability (r1-07),
and 3 correct wrong=0 boundaries that must stay refused (r1-08/09/10).

Source-verified against the merged reader (refusal codes + line refs) and
the live lanes (setup 4/0/6, answers 4/0/6 setup_wrong/gold_error 0,
15-case 15/0/0). Docs-only; no code, no serving lane, no SHA-lane content.
2026-06-07 05:30:14 -07:00
..
AGI-candidacy-autonomous-improvement-roadmap-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
composition-capability-scope.md docs: mark ADR-0174 Phase 5a shipped in composition-capability-scope 2026-06-03 16:23:53 -07:00
composition-wall-execution-plan-2026-06-03.md feat(r4): flip cv-0005 to serving — train_sample 6/44/0 -> 7/43/0 (ADR-0207 §5 step 2) 2026-06-03 22:20:12 -07:00
comprehension-primitive-inventory.md Add canonical composition analysis docs 2026-06-03 15:35:58 -07:00
D-close-consolidation-design-2026-06-06.md feat(determine): idle deductive consolidation — the loop learns from determined facts (Step D) 2026-06-06 12:28:09 -07:00
deductive-logic-phase-2-benchmark-runway-2026-06-04.md docs: session record (2026-06-04) + mark runway PR-1/PR-2 shipped 2026-06-04 16:54:03 -07:00
E-estimation-design-2026-06-06.md feat(determine): calibrated disclosed estimation — the engine earns the right to guess (Step E) 2026-06-06 13:49:07 -07:00
extraction-richness-audit-2026-06-03.md docs: ratify ADR-0207 — GSM8K comprehension/composition substrate 2026-06-03 19:42:47 -07:00
field-reasoner-wedge-design-and-falsification-2026-06-04.md docs: field-reasoner wedge design + falsification dossier 2026-06-04 19:22:16 -07:00
field-wedge-ablation-result-2026-06-04.md feat(field-wedge): ablation verdict — field is decoration on additive (C3) (Phase W.2) 2026-06-04 19:44:22 -07:00
gsm8k-lift-program-strategy-2026-06-04.md fix(gsm8k): disable unsound serving bridges — restore sealed wrong=0 (0/5 -> 0/0) 2026-06-04 01:55:05 -07:00
L10-continuity-spike-design-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
L10-runtime-scoping-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
L10-shapeBplus-persistence-scope-2026-06-05.md docs(design): L10/L11 lived-spine design records + AGI-candidacy roadmap 2026-06-05 15:11:08 -07:00
math-serving-seam-design-2026-06-06.md feat(derivation): math-serving reach seam — select_self_verified is policy-aware (ADR-0206 §5) 2026-06-06 15:46:14 -07:00
oov-grounding-determinism-morphology-affinity-collapse.md fix: derive oov grounding from token content 2026-06-06 05:46:01 -07:00
phase2-general-comprehension-organ-scope-2026-06-05.md docs(analysis): Phase 2 spike — syntax pack is not a parser; structural-decode fork 2026-06-05 15:41:36 -07:00
pivot-to-deductive-logic-2026-06-04.md feat: ratify independent-gold invariant (INV-25) + SHA-pin deductive lane 2026-06-04 15:56:28 -07:00
question-layer-gap-survey.md
r1-inventory-ledger-2026-06-07.md docs(analysis): R1 comprehension inventory ledger 2026-06-07 05:30:14 -07:00
real-gsm8k-capability-measurement-2026-06-04.md docs: fourth lift attempt falsified (strict sum-reader 0/2) — exhaustive 2026-06-04 02:52:24 -07:00
REALIZE-R1-DETERMINE-scope-2026-06-06.md fix(realize): lookback hardening — defensive admissibility re-assertion + coverage 2026-06-06 06:31:54 -07:00
REALIZE-scope-2026-06-06.md docs(analysis): REALIZE phase scope (Step 3) — verified against the real substrate 2026-06-06 01:48:19 -07:00
relational-grounding-extension-2026-06-04.md feat(deductive): binary relations + multi-variable grounding (finite propositional) 2026-06-04 20:17:33 -07:00
solver-operation-coverage.md
universal-structure-and-field-symbol-coherence-gate-2026-06-04.md feat: Phase 2 — finite-entity grounding compiler + Phase 1.5 finding 2026-06-04 16:32:03 -07:00
VERIFIED-canonical-comparison-scoping-2026-06-06.md docs(analysis): VERIFIED producer — validate-first verdict is DO NOT BUILD (comprehension-bound) 2026-06-06 16:09:41 -07:00
wiring-promotion-gate-brief-2026-06-03.md docs: composition-wall execution scope (ADR-0207 §5 step 2) 2026-06-03 21:14:02 -07:00