core/docs/analysis
Shay 0ac725ccfd docs: plan — universal structure + field<->symbol coherence gate
Planning-only design doc for the comprehension->structure->solve->verify spine:
converge reading onto the binding-graph interlingua; field comprehends, structure
bridges, symbol verifies; their AGREEMENT is the wrong=0 gate and the genuine
second derivation that unblocks t2_precision. Field-as-reasoner must EARN each
domain against independent gold (Phase 1.5 wedge: field-decides-entailment vs
ROBDD oracle); never asserted unfalsifiably. INV-25 is Phase 0.
2026-06-04 15:56:28 -07:00
..
composition-capability-scope.md docs: mark ADR-0174 Phase 5a shipped in composition-capability-scope 2026-06-03 16:23:53 -07:00
composition-wall-execution-plan-2026-06-03.md feat(r4): flip cv-0005 to serving — train_sample 6/44/0 -> 7/43/0 (ADR-0207 §5 step 2) 2026-06-03 22:20:12 -07:00
comprehension-primitive-inventory.md Add canonical composition analysis docs 2026-06-03 15:35:58 -07:00
deductive-logic-phase-2-benchmark-runway-2026-06-04.md docs: define deductive logic phase 2 benchmark runway 2026-06-04 09:33:23 -07:00
extraction-richness-audit-2026-06-03.md docs: ratify ADR-0207 — GSM8K comprehension/composition substrate 2026-06-03 19:42:47 -07:00
gsm8k-lift-program-strategy-2026-06-04.md fix(gsm8k): disable unsound serving bridges — restore sealed wrong=0 (0/5 -> 0/0) 2026-06-04 01:55:05 -07:00
pivot-to-deductive-logic-2026-06-04.md feat: ratify independent-gold invariant (INV-25) + SHA-pin deductive lane 2026-06-04 15:56:28 -07:00
question-layer-gap-survey.md Harden no-reference n-times comparative guard 2026-06-03 15:22:42 -07:00
real-gsm8k-capability-measurement-2026-06-04.md docs: fourth lift attempt falsified (strict sum-reader 0/2) — exhaustive 2026-06-04 02:52:24 -07:00
solver-operation-coverage.md Harden no-reference n-times comparative guard 2026-06-03 15:22:42 -07:00
universal-structure-and-field-symbol-coherence-gate-2026-06-04.md docs: plan — universal structure + field<->symbol coherence gate 2026-06-04 15:56:28 -07:00
wiring-promotion-gate-brief-2026-06-03.md docs: composition-wall execution scope (ADR-0207 §5 step 2) 2026-06-03 21:14:02 -07:00