Answers all eight L11 sub-questions by selecting the narrowest
commitment compatible with existing ADR-0057 / 0151 / 0152 / 0155
machinery and the ratify-proposal workflow.
Headline decisions:
- Queue is a DERIVED VIEW over teaching/proposals/proposals.jsonl
∪ contemplation/runs/*.json. No new persistence file.
- Queue identifier = proposal_id (deterministic over content per
ADR-0151). States: ADR-0057's existing alphabet.
- Three operator surfaces: GitHub PR (inspect-only, mobile),
workflow_dispatch (accept|reject|withdraw, mobile),
local CLI (audit-grade authority). PR-merge admits; it does
not ratify.
- Engine keeps serving turns while items are pending; pending
proposals are observable but never active truth; proposal-on-
proposal dependencies forbidden.
- Pending cap 256. Dedup by deterministic proposal_id. No
wall-clock expiry — staleness is measured in proposals, not
seconds. Full queue emits a typed `queue_full` report instead
of silently dropping.
- Only the repo owner ratifies; workflow path enforces an actor
allow-list and fails closed. Every transition records
ratifier_kind, actor, commit_sha, workflow_run_id, review_date.
Five-step implementation plan included; each step is small,
self-contained, and ships its own ADR-compatibility test.
Status: proposed. Closes W-009 once implementation lands.
Scope discipline: docs-only. No code, no workflow changes, no
tests, no ADR ratification yet. Pure prose contract.