# docs/assessment/ — The Holistic Macro→Micro Assessment (2026-07-27) A read-only, evidence-bearing assessment of CORE's cognitive-cycle design versus implementation fulfillment, conducted under `docs/conceptualizing_engineering_mastery.md` at `forgejo/main` @ `8927c563`. Phases 0–5 change no runtime behavior, fix no defect, and decide nothing — they produce evidence and judgments for ruling. Phase 6 adds the execution plan built on them and the ruling packet they require. **Start here:** [`40-assessment.md`](40-assessment.md) — the synthesis (the verdict, the five frontiers, the recommended attack order). Then [`50-execution-plan.md`](50-execution-plan.md) for what follows from it, and [`50-rulings.md`](50-rulings.md) for what is waiting on a decision. The registers rank the work; the cards are the evidence base. | File / dir | Phase | What it is | |---|---|---| | [`00-scope-and-method.md`](00-scope-and-method.md) | — | Charter, method, rules of engagement, phase/executor table | | [`01-phase0-ground-truth.md`](01-phase0-ground-truth.md) | 0 | Corpus triage, the five unreconciled articulations, system-map recovery | | [`02-layer-taxonomy.md`](02-layer-taxonomy.md) | 1 | The two-axis taxonomy: 7 macro layers + 2 cross-cuts over 33 zones; the Candidate Register (CR-1…4); completeness criteria | | [`03-card-schema.md`](03-card-schema.md) | 1 | The card metadata schema: liveness ⊥ fitness, design ⊥ build, sabotage-tested evidence, `verified_at` stamps | | [`10-layer-cards/`](10-layer-cards/) | 2 | Nine layer cards (M0–M6, MG, MV), every liveness label re-verified against code | | [`04-phase2-findings.md`](04-phase2-findings.md) | 2 | Stage-coverage audit; corrections to Phase 0; findings F-1…F-5 | | [`20-component-cards/`](20-component-cards/) | 3 | Eight component cards: the four zero-subsystem zones + always-on, derivation organs, surface selection, attention | | [`05-phase3-findings.md`](05-phase3-findings.md) | 3 | Corrections C-1…C-5; findings F-6…F-10; the consolidated Phase-4 seed list | | [`30-gap-register.md`](30-gap-register.md) | 4 | **The live gap register** — 20 entries, 4 tiers, each with evidence + deciding authority (proposes superseding `docs/gaps.md`) | | [`31-hindrance-audit.md`](31-hindrance-audit.md) | 4 | Eleven hindrances with fitness verdicts and better homes; five candidates examined and cleared | | [`40-assessment.md`](40-assessment.md) | 5 | The synthesis | | [`50-execution-plan.md`](50-execution-plan.md) | 6 | **The execution plan** — five waves + five frontier tracks over every G/H entry, with the dependency gates and the risks. §0 carries seven corrections to the assessment found while sizing it | | [`50-rulings.md`](50-rulings.md) | 6 | **The ruling packet** — R-1…R-14, each with evidence, options, a recommendation, and the exact diff that follows from each choice. Wave 0's deliverable | **Maintenance contract** (from §8 of the synthesis): a card whose `verified_at` falls behind a load-bearing arc is testimony, not evidence. Update cards when their subsystems move, or this directory becomes the next dead instrument it was built to replace. **Standing note:** the PR #138 fabrication findings appear throughout as *measured & pinned, fix held for ADR + ratification* — recorded, never re-discovered, never fixed here, per explicit instruction.