docs(ADR-0170): injector contract widening + DCS-S1 schema-gap finding (#372)
DCS-S1 (proper-noun possession sub-shape expansion) investigation
revealed that the recognizer-injector path's `CandidateInitial`-only
return type is a substrate-level constraint blocking four Wave-Next
sub-shape categories — not just one.

## Two artifacts

1. **`docs/handoff/DCS-S1-FINDING.md`** — investigation result. Of
   the 21 DCS-refused GSM8K cases, zero are pure S1-only blockers.
   Acquisition-verb expansion (`collected`, etc.) conflicts with
   ADR-0131.G.1's branch-disagreement discipline. The right fix is
   the DCS injector emitting `CandidateOperation(add)`, but the
   `inject_from_match` return type doesn't allow that.

2. **`docs/decisions/ADR-0170-injector-contract-widening.md`** —
   scoping ADR. Names the contract change, the four categories it
   unblocks (DCS-S1 acquisition, A1 currency, A3 multiplicative,
   A4 temporal), the three load-bearing rules it must preserve
   (ADR-0131.G.1, SentenceChoice union, admissibility gates), and
   a 5-step implementation outline.

## Pattern recognised

Wave-Next surfaced four schema gaps. All four trace to the same
constraint: per-category injectors can only emit `CandidateInitial`.
The right next-capability work is ADR-0170 ratification, then a
small no-behavior-change PR widening the contract, then per-injector
follow-up PRs against the widened contract.

That is the actual lift-per-risk path for GSM8K Round-1 closure.

## Test plan

Docs-only. No code, no test, no eval, no pack change.

## Cross-references

- ADR-0163.D.2 — original parsed_anchors → solver-state ADR
- ADR-0131.G.1 — branch-disagreement discipline ADR-0170 preserves
- ADR-0167 — parallel teaching-corridor mechanism (independent)
- ADR-0167-FOLLOWUPS §7 — Wave-Next findings backlog
- WAVE-NEXT-REVISED — parent plan; ADR-0170 is the upstream blocker
- PR #369 — A2's schema-refusal artifact (first observation of gap)