Authority-ratified per the ADR-0207 convention (Accepted (ratified DATE)):
- ADR-0181 (audio), ADR-0197 (vision), ADR-0208 (environmental loop),
ADR-0209 (sensorimotor afferent) -> Accepted (ratified 2026-06-03).
All four are implemented + test-backed (0208/0209 falsifiability deeply
verified in the lookback; 0181/0197 backed by CRDT-merge/compiler/mount/
eval-gate suites, all green in the 182-test sweep).
- ADR-0198 deliberately NOT ratified: partially-implemented spike (Gap A +
fail-closed efferent gate landed; \xc2\xa73 verdict-lowering + motor decoder
deferred behind a dedicated motor governance ADR).
CLAUDE.md Work Sequencing now records the sensorium/modalities arc as a
sanctioned parallel track that does not displace the near-term sequence and
is disjoint from the GSM8K serving path. Markdown only; no test asserts ADR
status or the work-sequencing text.
ADR-0181/0197/0208/0209 were marked Proposed despite test-backed
afferent implementations merged to main; flip to Accepted with
verifiable Implementation lines (paths + PRs + falsifiable tests).
ADR-0198's 'no implementation' status was stale (Gap A protocol
change + baseline efferent gate landed in #541); correct it and
document the deferred §3 safety/ethics verdict-lowering as an
explicit blocking obligation before any motor decoder mounts.