Commit graph

7 commits

Author SHA1 Message Date
Shay
8e3a850a2c docs(planning): reconcile public roadmap with merged #687/#688 evidence
Tool Authority Demo (#688) was still tagged 'draft PR / in review' but it
merged at c55f7dfb. Hybrid Verification Demo (#687) lacked the claims-authority
framing and the agreement-is-not-safety finding. Reposition both as merged
evidence, name the next public evidence target, and align epistemic-state vocab.

- #687 = authority over claims; #688 = authority over proposed tool actions.
- Removed stale 'In progress / draft PR / in review' status on #688.
- Added explicit next-target ordering: Epistemic Truth-State -> Embodied
  Authority Simulation -> SaaS/On-Prem Boundary.
- No named-company, outreach, or production/robotics overclaims introduced.
2026-06-11 12:01:00 -07:00
Shay
05133fd88b docs(planning): remove private outreach strategy from public repo 2026-06-11 10:04:46 -07:00
Shay
dda4cddfda docs(planning): expand authority substrate outreach plan and checklists with full content 2026-06-11 06:20:41 -07:00
Shay
518e9ebd1c docs(planning): add xAI Tesla embodied authority checklist 2026-06-11 05:44:04 -07:00
Shay
61d1467592 docs(planning): add Anthropic authority substrate checklist 2026-06-11 05:40:46 -07:00
Shay
a78e67a0be docs(planning): expand authority substrate outreach plan 2026-06-11 05:37:22 -07:00
Shay
2ccd0d005c docs(planning): add authority substrate outreach plan 2026-06-11 05:33:16 -07:00