Fixes the decomposition Phases 2-3 fill and Phase 4 audits against, per
Pillar I: criteria before judgment. Five decisions recorded explicitly:
- D1 The five unreconciled articulations answer five DIFFERENT questions
(what for / what happens today / by what mechanism / judged how / built
where) and become axes of one taxonomy rather than competitors. Functional
axis = the AGENTS.md north star; structural axis = 7 macro layers (M0
Substrate, M1 Knowledge & Memory, M2 Afferent, M3 Comprehension &
Reasoning, M4 Expression & Serving, M5 Learning & Growth, M6 Continuity &
Process) + 2 cross-cuts (MG Governance, MV Verification), grouping all 33
system-map zones with straddles recorded honestly. Mind-physics blueprint
dispositioned element-by-element (identity/compositional/renderer =
superseded by stronger implementations; Allocation Physics and
DriveGradientMap = orphans -> Candidate Register).
- D2 System-map schema EXTENDED, not replaced: 7-value liveness kept;
four missing dimensions added as orthogonal fields — evidence (with
would-fail-if-absent sabotage bit), capacity (designed/measured/ceilings),
design-vs-build split, fitness (6-value: fit/strained/misplaced/
wrong-solution/superseded-in-place/undetermined). Liveness ⊥ fitness:
the 34 organs are live-serving + superseded-in-place, a state no merged
enum could express.
- D3 Completeness criteria fixed: coverage = evidence-bearing ownership of
a functional stage; deferred-with-ruling ≠ missing; pins must run.
- D4 Candidate Register: CR-1 attention/allocation (the ~73%-of-turn-time
hot path has no owner), CR-2 agenda/drive (mechanisms without a chooser;
L10 risks landing as a heartbeat with nothing to want), CR-3 efferent
action (needs an explicit deferred-vs-out-of-telos ruling), CR-4 temporal
self-location (determinism vs lived time, undesigned). Considered-and-not-
registered recorded (sociality, affect, embodiment, self-governance-as-
layer) so the boundary is visibly examined.
- D5 Assessment output is COMMITTED (reviewable, versioned, visible);
system map stays local as a regeneratable navigation index. Staleness
handled by verified_at SHA stamps on every card.
Phase 2 work order: nine layer cards, priority M6 > M3 > M4 > M5; re-verify
every map liveness label; run the stage-coverage audit with evidence; the
four zero-subsystem zones scoped honestly and queued first for Phase 3.