Commit graph

2 commits

Author SHA1 Message Date
Shay
65ccb8eeee
docs(session): 2026-05-26 corridor closure — first GSM8K lift + workbench operational (#305)
Captures today's end-to-end closure of the math architecture corridor
(ADR-0163 Phase A → B → C → D + operator ratification, 15 PRs, first
non-zero GSM8K correct count: 0 → 3 with wrong = 0 preserved) and the
workbench surface (W-026 API + ADR-0162 design system + W-027 shell +
W-028 chat surface) becoming operational end-to-end.

Added:
- docs/sessions/SESSION-2026-05-26-corridor-closure.md — full session
  ledger, per-fork accomplishments, three lifted GSM8K cases,
  unexpected-positive observation about skip-only wiring, deferred
  work, architectural state at close.

Updated:
- docs/master-plan-post-substrate-audit.md — 2026-05-26 amendment
  banner pointing to the session recap; historical 2026-05-24 plan
  preserved below.
- docs/PROGRESS.md — appended a new section capturing the day's 15
  PRs by fork (math, workbench, HITL), the first-lift counts, and
  what stays open.
- docs/decisions/ADR-0163-gsm8k-path-to-mastery.md — Round 1
  amendment with the actual lift evidence, the three lifted cases,
  the capability-axis preservation, and the unexpected-positive note
  about skip-only wiring doing more than projected.

Scope: docs-only.  No runtime, no tests, no code changes.
2026-05-26 13:49:08 -07:00
Shay
c93c1f6ce7
docs: master plan post-substrate-audit (7 phases + EoD snapshot) (#262)
End-of-day handoff doc. Carries strategic plan + active-PR snapshot
across the session boundary so morning-self picks up cleanly.

Contents:
  - Three guiding rules (fully-wired definition, thesis check,
    L10 is load-bearing)
  - EoD snapshot: PRs in flight (#261 B, gate unopened), 5 W-* closures
    today, 49-test quarantine registry with cluster breakdown, AM
    resumption order
  - 7-phase plan in dependency order:
    1. Hygiene & honesty (today)
    2. Operator decisions (5 quick calls)
    3. Test debt paydown (5 clusters, easiest→hardest)
    4. L10 runtime model (THE load-bearing decision)
    5. L10 cascade (6 items unlock once L10 commits)
    6. 'Decodes, not generates' milestone (Phase 5 enables this)
    7. Validation & projection (patents, Rust parity, benchmarks)
  - Tonight's lessons (4 items including pytest-xdist surprises and
    the lane subprocess timeout calibration)
  - Cross-refs to ratchet, registry, scopes, and memory entries
2026-05-25 06:08:47 -07:00