Commit graph

3 commits

Author SHA1 Message Date
Shay
bd6e0377e1 docs: ratify sensorium afferent ADRs + acknowledge arc in work-sequencing
Authority-ratified per the ADR-0207 convention (Accepted (ratified DATE)):
- ADR-0181 (audio), ADR-0197 (vision), ADR-0208 (environmental loop),
  ADR-0209 (sensorimotor afferent) -> Accepted (ratified 2026-06-03).
  All four are implemented + test-backed (0208/0209 falsifiability deeply
  verified in the lookback; 0181/0197 backed by CRDT-merge/compiler/mount/
  eval-gate suites, all green in the 182-test sweep).
- ADR-0198 deliberately NOT ratified: partially-implemented spike (Gap A +
  fail-closed efferent gate landed; \xc2\xa73 verdict-lowering + motor decoder
  deferred behind a dedicated motor governance ADR).

CLAUDE.md Work Sequencing now records the sensorium/modalities arc as a
sanctioned parallel track that does not displace the near-term sequence and
is disjoint from the GSM8K serving path. Markdown only; no test asserts ADR
status or the work-sequencing text.
2026-06-03 22:21:50 -07:00
Shay
e5bc73ebb9 docs: reconcile sensorium ADR statuses with shipped implementation
ADR-0181/0197/0208/0209 were marked Proposed despite test-backed
afferent implementations merged to main; flip to Accepted with
verifiable Implementation lines (paths + PRs + falsifiable tests).
ADR-0198's 'no implementation' status was stale (Gap A protocol
change + baseline efferent gate landed in #541); correct it and
document the deferred §3 safety/ethics verdict-lowering as an
explicit blocking obligation before any motor decoder mounts.
2026-06-03 21:51:59 -07:00
Shay
2d2b096784 Add vision evidence and sensorimotor contracts 2026-06-03 20:27:46 -07:00