Commit graph

1 commit

Author SHA1 Message Date
Shay
5ac3e3ff2f docs: ADR-0119 — GSM8K eval lane roadmap (Phase 5 decomposition)
Umbrella ADR for Phase 5 of ADR-0114. Decomposes the eval-lane work
into eight sub-phases (5.1..5.8) that ship under their own ADRs.

Sub-phase scope:
  5.1 — sealed-holdout encryption (one lane, fabrication_control)
  5.2 — CORE-original GSM8K-style corpus (dev + public, 200 cases)
  5.3 — lane runner (parser → solver → verifier → realizer)
  5.4 — frontier-baseline comparison (Obligation #7)
  5.5 — adversarial generation; misparse rate zero (Obligation #8)
  5.6 — depth-curve measurement harness (Obligation #6, measurement)
  5.7 — sealed GSM8K test as the holdout (Obligation #1, lane-side)
  5.8 — overall lane gate; new gsm8k_capability_shape

Roadmap only — no code lands with this ADR. Each sub-phase ships
independently and discharges a specific ADR-0114a obligation.

Critical invariant: dev + public splits are CORE-original; the real
GSM8K test set enters only via the encrypted holdout under 5.7.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-22 17:18:19 -07:00