docs: amend ADR-0207 §5 step 1 — WIRING not the lowest-risk crux (tree-verified)
Reading the actual gate logic (product_bridge/pool/verify) corrected §5's sequencing optimism, before merge: - The safe wire is already done (product_bridge at :530); its safety is a two-token target whitelist (money+make/earn, weight+total/move) hardcoded to 0003/0021 — it generalizes nothing. - Verified live (2026-06-03): the general composer resolve_pooled refuses ALL ten R1/R4/R5/R6 corpus positives (R1/R4 build zero candidates; R5 only wrong ones) -> wiring yields +0 correct; and it wrong-commits 0016 -> 510, so wiring it wholesale is a live wrong=0 regression the disagreement rule does not catch. So WIRING and COMPOSITION are the same task: composer production per shape, each behind a structural promotion gate (extract_target + target_units, not disagreement alone); the wire is the trivial last step. Core ratification (freeze, design-of-record, gates, sealed-set measurement) unchanged.
This commit is contained in:
parent
94bf1be1bc
commit
81209ed913
1 changed files with 14 additions and 8 deletions
|
|
@ -126,15 +126,21 @@ not rewriting it.
|
|||
> now solves 864 end-to-end through the derivation composer. See
|
||||
> [extraction-richness-audit-2026-06-03](../analysis/extraction-richness-audit-2026-06-03.md).
|
||||
|
||||
Execute these three levers, in order:
|
||||
Execute these three levers — listed by role, not by sequence (lever 1 explains why the
|
||||
wire is the *last*, trivial step and composition the real first work):
|
||||
|
||||
1. **WIRING — the crux.** Connect the disjoint `generate/derivation/` reader (where the
|
||||
enriched extractor *and* the ADR-0178 composer already live) into the **serving
|
||||
candidate-graph path**, so its output counts toward the live metric. The derivation
|
||||
machinery is built and enriched but disjoint; until it feeds serving, none of its richness
|
||||
moves 6/44/0. `product_bridge` (§2) is the lone existing tendril and the proof the wiring
|
||||
pattern works. **This is wiring, not new design**, and it is the central task — not a
|
||||
preliminary.
|
||||
1. **WIRING — trivial, and already done for the safe shapes.** The wire pattern
|
||||
(`product_bridge` at `:530`: `resolve(text) → CandidateGraphResult | fall-through`) is
|
||||
proven, but it generalizes nothing: `product_bridge` promotes only via a two-token target
|
||||
whitelist (`money`+`make/earn`, `weight`+`total/move`), hardcoded to 0003/0021. Extending
|
||||
it is **not** the lowest-risk first step. Verified on the tree (2026-06-03): the general
|
||||
composer (`resolve_pooled`) refuses **all ten** R1/R4/R5/R6 corpus positives — R1/R4 build
|
||||
zero candidates, R5 builds only wrong ones — so wiring it yields **+0 correct**; and it
|
||||
wrong-commits `0016 → 510`, so wiring it wholesale is a live `wrong=0` regression that
|
||||
disagreement does **not** catch. Therefore WIRING and COMPOSITION are the **same task**:
|
||||
the real first work is composer production for each target shape, each behind a structural
|
||||
promotion gate (op-class/target proof via `extract_target` + `target_units`, not
|
||||
disagreement alone). The wire is the last, trivial step once a shape builds-and-certifies.
|
||||
2. **COMPOSITION (ADR-0178) — the actual wall.** Complete the derivation composer's
|
||||
multi-step assembly: which quantities group, via which ops, in what order (the R4/R5/R6
|
||||
lever). This is the genuine research risk; extraction already feeds it.
|
||||
|
|
|
|||
Loading…
Reference in a new issue