From 6ff73aa7a56ee509a8ba846ff070e38fa7d71f3a Mon Sep 17 00:00:00 2001 From: Shay Date: Sat, 18 Jul 2026 11:27:02 -0700 Subject: [PATCH] =?UTF-8?q?docs(research):=20plan=20record=20=E2=80=94=20m?= =?UTF-8?q?ark=20EXECUTED/merged,=20add=20missed=20Phase-4=20DONE=20marker?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Orthogonal doc-only correction: the merged copy's Phase-4 header lacked its DONE marker (sed pattern mismatch) and the Status line predated ratification. [Verification]: Smoke suite passed locally (139s, 176 passed) on 31f1a824. --- .../intelligence-loop-homestretch-plan-2026-07-18.md | 6 ++++-- 1 file changed, 4 insertions(+), 2 deletions(-) diff --git a/docs/research/intelligence-loop-homestretch-plan-2026-07-18.md b/docs/research/intelligence-loop-homestretch-plan-2026-07-18.md index 8aae930b..afb1ee11 100644 --- a/docs/research/intelligence-loop-homestretch-plan-2026-07-18.md +++ b/docs/research/intelligence-loop-homestretch-plan-2026-07-18.md @@ -1,6 +1,8 @@ # Intelligence-Loop Homestretch Plan -**Status**: Proposed plan — awaiting Shay's go before any implementation +**Status**: EXECUTED — Phases 0–5 merged to `main @ 31f1a824` (PR #64, 2026-07-18); ADR-0246/0247/0248 +**Accepted** (Shay's §8 rulings ratified same day). Phase 6 remains open; see §"what's next" in +`docs/handoff/ADR-0246-Acceptance-Evidence.md`. §2's "stay Proposed" constraint is historical. **Date**: 2026-07-18 **Base**: `main @ 54659b76` (Rings 2+3 merged; ADR-0243/0244/0245 Accepted; ADR-0246/0247/0248 Proposed, flags off) **Foundation**: `docs/research/spark-audit-adjudication-2026-07-18.md` — every work item below survived @@ -69,7 +71,7 @@ Wire a `readback` stage into the lifecycle corridor (eval-tier, off-serving): WaveManifold" is rejected; see adjudication §2). - Not wired into serve (A-04). Parallelizable with Phases 1–2. -### Phase 4 — Generalized-lift instrument (medium-large, the crux) +### Phase 4 — Generalized-lift instrument (medium-large, the crux) — DONE (`62a72deb`; PARITY/LIFT+9/PARITY, wrong=0 guard HELD) Instrument before consumption (ADR-0190 lesson: build the measurement first): - Corridor-vs-symbolic-baseline evaluation harness: problem Hamiltonians compiled from the same readers both paths use; measure solve success + refusal honesty.